Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install railway sleepers
Install railway sleepers
Unit of competency
National Code
TLIS2031
TLIS2031
State Code
AVH79
AVH79
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
36
Description
This unit involves the skills and knowledge required to install railway sleepers manually or mechanically in accordance with safeworking and regulatory requirements, and workplace procedures.It includes preparing for work, restoring track gauge, installing or replacing sleepers and completing documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under some supervision, generally within a team environment. It involves the application of routine operational principles and procedures when installing railway sleepers, as part of workplace activities across a variety of operational contexts within the Australian rail system.Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.
Notes
Elements and Performance Criteria
1 Prepare for work
- 1.1 Worksite is identified
- 1.2 Hazards are identified, risks are assessed and control measures are implemented
- 1.3 Installation, replacement or repair method is selected to meet work requirements in accordance with worksite standards and procedures
- 1.4 Plant, equipment and materials are prepared for work
2 Restore track gauge
- 2.1 Equipment and tools appropriate to task are selected and checked for correct operation in accordance with manufacturer instructions and workplace procedures
- 2.2 Track gauge is restored, as required, using appropriate methods in accordance with worksite standards and procedures
- 2.3 Track gauge measurements are recorded in accordance with workplace procedures
3 Install or replace sleeper
- 3.1 Unserviceable sleepers are extracted, as required, using manual or mechanical methods in accordance with worksite procedures
- 3.2 New sleeper is installed using manual or mechanical methods in accordance with worksite procedures
- 3.3 Sleeper plates are installed on relevant sleeper types in accordance with worksite procedures
- 3.4 Sleeper is suitably packed or supported by appropriate methods in accordance with worksite procedures
- 3.5 Work is completed to meet track geometry requirements in accordance with worksite procedures
- 3.6 Work is checked for compliance with acceptance standards for spacing, skew and geometry
4 Complete documentation
- 4.1 Required documentation procedures and processes are confirmed
- 4.2 Documentation is filled in legibly and proofread
- 4.3 Documentation is processed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5340 | TLIS2031A | Install railway sleepers | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGM7 | TLI27120 | Certificate II in Rail Infrastructure | Qualification |
| AWT3 | TLI21315 | Certificate II in Rail Infrastructure | Qualification |
| BHH8 | TLI27121 | Certificate II in Rail Infrastructure | Qualification |
| AWV9 | TLI22215 | Certificate II in Tram or Light Rail Infrastructure | Qualification |