Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Transfer wood chips

Transfer wood chips

Unit of competency
National Code
FPISAW3216B
State Code
D6072
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/05/2011
State Implementation and Classification
Approved Date
25/06/2012
Field of Education
030717 - Plant And Machine Operations
Original Release Date
25/06/2012
Nominal Hours
40
Description
This unit describes the outcomes required to operate the transfer process and transfer wood chips to stockpile or transport systemsGeneral workplace legislative and regulatory requirements apply to this unit; however there are no specific licensing or certification requirements at the time of publicationThis unit replaces FPISAW3216A Transfer wood chips
Notes
Elements and Performance Criteria
1. Prepare to transfer wood chips
  • 1.1. Applicable Occupational Health and Safety (OHS), environmental, legislative and organisational requirements relevant to transferring wood chips are identified and followed
  • 1.2. Work order is reviewed and checked with appropriate personnel
  • 1.3. Type and quantity of wood chips to be transferred are acquired from the production process
  • 1.4. Equipment is selected appropriate to work requirements and checked for operational effectiveness in line with manufacturer's recommendations
  • 1.5. Transferral process is planned in line with site procedures and environmental requirements and deposit point inspected for access and cleanliness
  • 1.6. Communication with others is established and maintained in line with OHS requirements
2. Transfer wood chips
  • 2.1. Pre start-up checks are carried out on equipment in line with site requirements
  • 2.2. Machines and feed systems are started and adjusted to transfer wood chip to the stockpile or transport in line with organisational requirements
  • 2.3. Conveyor operations are monitored and jams cleared to ensure free flow of output material to transfer systems
  • 2.4. Wood chips are transferred using a chip slinger or air blower in line with site requirements and transfer specifications
  • 2.5. Slinger or blower is manoeuvred to enable filling or distribution over the required area
  • 2.6. Filling or distribution levels are checked and stopped or topped up in line with work order and capacity
  • 2.7. Transfer process and equipment faults are recorded and reported to the appropriate personnel
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
OHS requirements:
are to be in line with applicable Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
fatigue management
elimination of hazardous materials and substances
safe forest practices including required actions relating to forest fire
manual handling including shifting, lifting and carrying
machine isolation and guarding
Environmental requirements may include:
legislation
organisational policies and procedures
workplace practices
Legislative requirements:
are to be in line with applicable Commonwealth, State or Territory legislation, regulations, certification requirements and codes of practice and may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements may include:
legal
organisational and site guidelines
policies and procedures relating to own role and responsibility
quality assurance
procedural manuals
quality and continuous improvement processes and standards
OHS, emergency and evacuation procedures
ethical standards
recording and reporting requirements
equipment use and maintenance and storage requirements
environmental management requirements (waste minimisation and disposal, recycling and re-use guidelines)
Work order is to include:
instructions for the transfer of chips
and may include:
location
transport mode
feed rate
quantity
instructions for the environmental monitoring of work and procedures
environmental care requirements relevant to the work
Appropriate personnel may include:
supervisors
suppliers
clients
colleagues
managers
Wood chips
are the output product of converting wood into chip material which is then used to produce other products
Transferral is to include:
the movement of wood chips to stockpiles or transport arrangements using:
chip slingers
air blowers
Equipment may include:
chip slingers
air blowers
mechanised feed systems
and is to include:
procedures for equipment lock-out, ie protecting operators and co-workers from accidental injury by isolating the machine from the power source
Communication may include:
verbal and non-verbal language
constructive feedback
active listening
questioning to clarify and confirm understanding
use of positive, confident and cooperative language
use of language and concepts appropriate to individual social and cultural differences
control of tone of voice
body language
Pre start-up checks
are conducted to ensure:
equipment has been set-up correctly
systems are performing accurately
equipment is operating to optimum performance
Feed systems may include:
conveyors moving processed wood chips from the screening system to the transfer process
chutes or track systems moving processed wood chips from the screening system to the transfer process
Stockpile
is the large pile of processed wood chips ready for distribution or further down-stream processing
Transport may include:
ships
trains
trucks
Conveyor operation
is the process of moving wood chips to the transfer process and from the screening system
Chip slinger
is equipment which manoeuvres chips to the stockpile or transport
Air blower
is equipment which pumps wood chips to the stockpile or transport
Records and reports may include:
stockpile allocation
transport allocation
product type
size
inspection
grading and labelling outcomes
storage locations
quality outcomes
hazards
incidents
equipment malfunctions
and may be:
manual
using a computer-based system or other appropriate organisational communication system
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently transfer wood chips within organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to, and satisfy, all of the requirements of the elements of this unit and include demonstration of:
following applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice relevant to transferring wood chips
following organisational policies and procedures relevant to transferring wood chips
transferring wood chips in line with the work order and within prescribed organisational requirements
directing wood chips to the transport arrangements and stockpiles in line with organisational requirements and OHS regulations
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of required knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to follow relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to undertaking work applicable to this unit
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI11 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of required knowledge
Assessment must be by direct observation of tasks, with questioning on required knowledge and it must also reinforce the integration of employability skills
Assessment methods must confirm the ability to access and correctly interpret and apply the required knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
Replaces
State Code National Code Title Type
S4744 FPISAW3216A Transfer wood chips Unit of competency
Replaced By
State Code National Code Title Type
AXJ91 FWPSAW3216 Transfer wood chips Unit of competency
State Code National Code Title Type
J467 FPI30311 Certificate III in Sawmilling and Processing Qualification