Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain pole mounted switches and transformers
Install and maintain pole mounted switches and transformers
Unit of competency
National Code
TLIB4071
TLIB4071
State Code
AVK28
AVK28
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
23/02/2016
Nominal Hours
20
Description
This unit involves the skills and knowledge required to install and maintain pole mounted switches and transformers in accordance with safeworking and regulatory requirements, and workplace procedures.It includes planning installation and maintenance, preparing worksite, installing switches and transformers in accordance with workplace specifications, maintaining switches and transformers, and completing work.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice, rail industry standards and/or guidelines.People working on energised overhead or underground systems or electrical equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent to carry out the work involved.Work is performed under minimal supervision, generally within a team environment. It involves the application of routine operational principles and procedures when installing and maintaining pole mounted switches and transformers, as part of workplace activities across a variety of operational contexts within the Australian rail system.
Notes
Elements and Performance Criteria
1 Plan installation and maintenance
- 1.1 Works order is analysed and confirmed as required by site inspection
- 1.2 Resources required for the job are identified and scheduled in accordance with operational procedures
- 1.3 Hazards are identified, risks are assessed and control measures are implemented
- 1.4 Switch equipment and transformer are transported to worksite
- 1.5 Liaison and communication issues are resolved in accordance with organisational negotiation procedures
2 Prepare the worksite
- 2.1 Work plan and resources required are confirmed/checked at worksite
- 2.2 Personnel participating in the activity, including plant operators and contractors, are fully briefed
- 2.3 Road signs, barriers and warning devices are positioned to ensure a safe worksite
- 2.4 Safeworking practices are observed on or about the running track/line
- 2.5 Worksite is laid out in accordance with work plan to ensure minimum waste and rework
- 2.6 Systems/circuits are isolated as required, proved safe to work on in accordance with works order, and electrical permits are received/accepted/returned as required
3 Install switches and transformers
- 3.1 Switch equipment, transformers and earthing systems are installed and connected
- 3.2 Transformer is tested and voltage output is adjusted
- 3.3 Visual inspection is carried out to confirm equipment/apparatus is in a safe condition to test and/or commission
- 3.4 Commission is carried out in accordance with works order/plan
4 Maintain switches and transformers
- 4.1 Maintenance requirement is confirmed by detailed site diagnosis
- 4.2 Maintenance, including removal, repair, replacement and reinstatement, is carried out in accordance with works order and the condition of equipment
5 Complete work
- 5.1 Worksite is rehabilitated
- 5.2 Appropriate authority is notified on completion of work
- 5.3 Records and documentation for updating system data are completed and processed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5009 | TLIB4071A | Install and maintain pole mounted switches and transformers | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHV6 | TLI37122 | Certificate III in Rail Infrastructure | Qualification |
| BGM6 | TLI37120 | Certificate III in Rail Infrastructure | Qualification |
| BHI6 | TLI37121 | Certificate III in Rail Infrastructure | Qualification |
| AWQ2 | TLI32515 | Certificate III in Rail Infrastructure | Qualification |