Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Carry out grouting or cementing operations

Carry out grouting or cementing operations

Unit of competency
National Code
RIINHB324B
State Code
WC364
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
21/03/2012
State Implementation and Classification
Approved Date
16/08/2012
Field of Education
030399 - Process And Resources Engineering, N.e.c.
Original Release Date
16/08/2012
Nominal Hours
40
Description
This unit covers carrying out grouting or cementing operations in the drilling industry. It includes: planning and preparing for the process; performing measurement and calculations; conducting the grouting or cementing of hole; respond to problems; and managing cleaning of all equipment at completion of operations.
Notes
Elements and Performance Criteria
1. Plan and prepare for the grouting or cementing process
  • 1.1. Access, interpret and apply compliance documentation relevant to drilling industry grouting and cementing operations
  • 1.2. Obtain, confirm and apply work instructions for the allocated task
  • 1.3. Identify, manage and report all potential hazards
  • 1.4. Resolve coordination requirements with others at the site prior to commencing and during work during the grouting or cementing process
  • 1.5. Obtain and use appropriate personal protective equipment for grouting or cementing operations as listed in the work instructions or materials safety data sheets (MSDS)
  • 1.6. Ensure adequate material and equipment is available to complete the task successfully
  • 1.7. Select the appropriate grouting or cementing procedure to suite the application
2. Perform measurement and calculations
  • 2.1. Read tape measure accurately to carry out measurements of tank capacities, casing or rod lengths as required
  • 2.2. Record or complete tally sheets for number of lengths of casing placed in the hole as required
  • 2.3. Carry out calculations and measurements
  • 2.4. Record legibly on all reports
3. Conduct grouting or cementing of hole
  • 3.1. Manage mixing grout and any additives as per standard procedures
  • 3.2. Ensure that materials safety data sheets (MSDS) requirements for all materials used are followed
  • 3.3. Conduct grouting or cementing of hole using appropriate equipment and techniques
  • 3.4. Place grout or cement using appropriate techniques
  • 3.5. Monitor process to ensure consistency and accuracy of placed grout or cement
  • 3.6. Construct well head, hole identification and install hole security devices if required
  • 3.7. Dispose of any excess grout or cement according to site waste management procedures
4. Respond to problems
  • 4.1. Identify possible operational problems in equipment or process
  • 4.2. Identify symptoms of problems needing remedial action
  • 4.3. Determine possible fault causes
  • 4.4. Rectify problem using appropriate solution within area of responsibility
  • 4.5. Follow through items initiated until final resolution has occurred
  • 4.6. Report problems outside area of responsibility to designated person
5. Manage cleaning of all equipment at completion of grouting or cementing operations
  • 5.1. Ensure there is no spillage of grout, cement or additives to minimise any associated safety hazards
  • 5.2. Ensure cleaning equipment is used safely and effectively
  • 5.3. Give approved instructions and occupational health and safety requirements on the use of hazardous chemicals for cleaning
  • 5.4. Ensure that all cleaning equipment is kept in good working condition
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity, Disability Discrimination legislation
Grouting or cementing application may include:
securing casing for a production bore (gas, water or hydrothermal)
stabilising walls of drill hole
installing surface casing or standpipe
hole abandonment procedures
blocking sections of the hole
Grouting or cementing techniques may include:
pressure grouting or cementing
tremie method of placement
placing gout or cement using in socks or sausages
pouring grout or cement down hole
Work instructions may come from:
briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:
nature and scope of tasks
specifications
quality of finished works
achievement targets
operational conditions
obtaining of permits required
site layout
out of bounds areas
lighting conditions
plant or equipment defects
hazards and potential hazards
coordination requirements or issues
contamination control requirements
environmental control requirements
barricade and signage requirements
Hazards may include:
spread of contaminants as a result of the grouting or cementing process or cleaning processes
working in proximity to drilling rig
string makeup and breakout hazards
hazardous chemicals
Coordination requirements may include:
driller's assistants
other equipment operators
supervisors
mine or client personnel
Personal protective equipment includes:
steel-capped boots and hardhat
gloves
dust mask
eye and hearing protection
general protective and reflective clothing
Calculations and measurements may include:
diameters casing, hole
casing volumes
casing quantities and length
hole volumes
tank volumes
annular volumes
component volumes for grouting or cementing
hydrostatic pressures
specific gravity of grout or cement
Operational problems may include:
loss of grout or cement through walls of hole
casing fracturing or collapsing due to differential hydrostatic pressures
air locks or voids in grout or cement
grout or cement setting too fast
heat damaging casing
grout or cement not setting or being washed away
Cleaning equipment may include:
pressure cleaning
chemical cleaning
manual cleaning
abrasive mechanical cleaning

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting grouting or cementing operations in the drilling industry
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of grouting or cementing operations in the drilling industry
working with others to undertake and complete the grouting or cementing operations that meet all of the required outcomes
consistent timely completion of grouting or cementing operations that safely, effectively and efficiently meet the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete grouting or cementing operations in the drilling industry
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaced By
State Code National Code Title Type
WH491 RIINHB324D Carry out grouting or cementing operations Unit of competency
No information