Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Finish green concrete products
Finish green concrete products
Unit of competency
National Code
PMC552051C
PMC552051C
State Code
WA937
WA937
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/11/2010
Field of Education
030101 - Manufacturing Engineering
Original Release Date
19/11/2010
Nominal Hours
40
Description
This unit of competency covers the process of finishing green concrete products. It involves preparing and finishing surfaces and identifying and resolving process malfunctions.
Notes
Elements and Performance Criteria
1. Prepare to surface finish green concrete
- 1.1. Check drawings and work orders for finish requirements
- 1.2. Check product against relevant specification
- 1.3. Check required condition and set state of concrete
- 1.4. Prepare/mix surface finish as required
- 1.5. Prepare finish equipment
2. Finish surface green concrete as required
- 2.1. Apply finish/spray surface in accordance with procedures
- 2.2. Inspect surface after initial finishing and patch/rework as required
- 2.3. Continue finishing/monitor finish as appropriate
- 2.4. Inspect final finish after appropriate time and make any changes required to meet specification
- 2.5. Dispose of waste to requirements
3. Rectify routine problems
- 3.1. Identify the range of faults that can occur during the operation
- 3.2. Determine and rectify fault causes in accordance with procedures/work instructions
- 3.3. Identify and rectify equipment failure causes in accordance with procedures/work instructions
- 3.4. Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions
- 3.5. Identify non-routine problems and report to designated person
4. Control hazards
- 4.1. Identify hazards from the job to be done
- 4.2. Identify other hazards in the work area
- 4.3. Assess the risks arising from those hazards
- 4.4. Implement measures to control those risks in line with procedures
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Surface finishes
Surface finishes may include:
fine wood float
rough wood float
hand steel float
broomed
helicopter steel float
raked finish
Surface finishes may be applied before or after veneering
Surface finish after veneering may then also require further finish after curing
Typical problems
Typical problems may include:
off colour batches
bleeding between concrete mixes
consistency of veneer and cover
consistency of spray pattern
adequacy and consistency of surface finish
wet patching of surface finish
Occupational health and safety (OHS)
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Surface finishes
Surface finishes may include:
fine wood float
rough wood float
hand steel float
broomed
helicopter steel float
raked finish
Surface finishes may be applied before or after veneering
Surface finish after veneering may then also require further finish after curing
Typical problems
Typical problems may include:
off colour batches
bleeding between concrete mixes
consistency of veneer and cover
consistency of spray pattern
adequacy and consistency of surface finish
wet patching of surface finish
Occupational health and safety (OHS)
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the process be understood and that the importance of critical material properties, mixing variables and surface finishing techniques is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.
Consistent performance should be demonstrated. In particular look to see that:
surface finish matches specification and is consistent
coverage is adequate and consistent
sealer coverage is adequate and consistent.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Individual enterprises may choose to add prerequisites and co-requisites relevant to their processes.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the process be understood and that the importance of critical material properties, mixing variables and surface finishing techniques is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.
Consistent performance should be demonstrated. In particular look to see that:
surface finish matches specification and is consistent
coverage is adequate and consistent
sealer coverage is adequate and consistent.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Individual enterprises may choose to add prerequisites and co-requisites relevant to their processes.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2661 | PMCOPS251B | Finish green concrete products | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH45 | PMC552051 | Finish green concrete products | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W748 | PMC20110 | Certificate II in Manufactured Mineral Products | Qualification |
| W750 | PMC40110 | Certificate IV in Manufactured Mineral Products | Qualification |
| W749 | PMC30110 | Certificate III in Manufactured Mineral Products | Qualification |