Unit of competency Outline

Date retreived
22/07/2026 9:12 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Finish green concrete products

Finish green concrete products

Unit of competency
National Code
PMC552051
State Code
BAH45
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/06/2016
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030101 - Manufacturing Engineering
Original Release Date
05/08/2016
Nominal Hours
40
Description
This unit of competency covers the skills and knowledge required to finish green concrete products. It applies to all finishes applied to concrete before curing but after manufacturing operations up to final vibration and/or screeding the top surface flat.This unit of competency applies to operators who are required to prepare the equipment and materials, interpret formulae/mixing specifications, finish the surface and rectify routine problems. This unit of competency applies to an individual working alone or as part of a team or group and working in liaison with other shift team members, team leader and supervisor, as appropriate.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to surface finish green concrete
  • 1.1 Check drawings and work orders for finish requirements
  • 1.2 Check product against relevant specification
  • 1.3 Check required condition and set state of concrete
  • 1.4 Prepare/mix surface finish as required
  • 1.5 Prepare finish equipment
2 Finish surface green concrete as required
  • 2.1 Apply finish/spray surface in accordance with procedures
  • 2.2 Inspect surface after initial finishing and patch/rework as required
  • 2.3 Continue finishing/monitor finish as appropriate
  • 2.4 Inspect final finish after appropriate time and make any changes required to meet specification
  • 2.5 Dispose of waste to requirements
3 Rectify routine problems
  • 3.1 Identify the range of faults that can occur during the operation
  • 3.2 Determine and rectify fault causes in accordance with procedures/work instructions
  • 3.3 Identify and rectify equipment failure causes in accordance with procedures/work instructions
  • 3.4 Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions
  • 3.5 Identify non-routine problems and report to designated person
4 Control hazards
  • 4.1 Identify hazards from the job to be done
  • 4.2 Identify other hazards in the work area
  • 4.3 Assess the risks arising from those hazards
  • 4.4 Implement measures to control those risks in line with procedures
No information
No information
Replaces
State Code National Code Title Type
WA937 PMC552051C Finish green concrete products Unit of competency
Replaced By
State Code National Code Title Type
OAF10 MSMPMC314 Finish green concrete products Unit of competency