Unit of competency Outline

Date retreived
22/07/2026 9:26 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate vision systems

Operate vision systems

Unit of competency
National Code
CUAVSS312
State Code
ODF90
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
16/04/2021
State Implementation and Classification
Approved Date
26/11/2021
Field of Education
100701 - Audio Visual Studies
Original Release Date
26/11/2021
Nominal Hours
75
Description
This unit describes the skills and knowledge required to operate a range of standard vision system equipment during live productions or events.The unit applies to those who use some discretion and judgement and operate under broad supervision within an established framework of plans and workplace procedures.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Participate in technical run-throughs
  • 1.1 Confirm technical and production requirements with required personnel
  • 1.2 Plot and run through cues on direction according to equipment, sequencing, timing and speed requirements
  • 1.3 Identify problems and modify equipment as required
  • 1.4 Change cues and modify running sheets and other documentation as required
2. Undertake vision system operations
  • 2.1 Check functionality and working order of primary and backup equipment
  • 2.2 Deliver required vision effects by executing on cue all vision system operations
  • 2.3 Modify cues, as required, to cater for unexpected contingencies
  • 2.4 Respond to equipment malfunctions by rectifying faults safely and efficiently and inform required personnel
  • 2.5 Use backup systems as required
3. Complete vision system operations
  • 3.1 Power down equipment according to manufacturer instructions and organisational and safety procedures
  • 3.2 Secure and pack down vision systems using safe lifting techniques
  • 3.3 Prepare vision system equipment for transport as required
  • 3.4 Leave the work site in the original or improved condition
  • 3.5 Complete and distribute workplace documentation as required
  • 3.6 Adjust work practices according to feedback from required personnel
No information
No information
Replaces
State Code National Code Title Type
WI232 CUAVSS302 Operate vision systems Unit of competency