Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Close complex projects
Close complex projects
Unit of competency
National Code
PSPPM503B
PSPPM503B
State Code
C8235
C8235
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
22/07/2014
Field of Education
080315 - Project Management
Original Release Date
22/07/2014
Nominal Hours
50
Description
This unit covers closure of projects that may be reasonably complex in terms of scope, degree of risk, political, cultural and social factors that apply, consequences of failure and degree of control of the projects. It includes reviewing project activity and managing project closure. Contract management requirements are not included as this aspect is addressed by units of competency within the Competency field of Procurement and Contract Management.In practice, closing complex projects overlaps with other generalist and specialist work activities such as acting ethically, coordinating resource allocation and usage, developing client services, undertaking research and analysis.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication
Notes
Elements and Performance Criteria
1. Review project activity
- 1.1 Evaluation of project process, supplier performance and achievement against objectives is undertaken in consultation with stakeholders and results are reported in accordance with the project plan evaluation framework and organisational policy and procedures.
- 1.2 The extent to which clients needs were met is evaluated and action to rectify problems is identified and documented.
- 1.3 Implications of project outputs/outcomes for policies and operating procedures are identified and recommendations are made for their amendment.
- 1.4 Information obtained from the evaluation of the project is provided in accordance with organisational requirements so it may be used to improve relevant policy and practice .
2. Manage project closure
- 2.1 Any funding associated with the project is acquitted against project budget items, and financial records are checked for accuracy and completed in accordance with organisational procedures.
- 2.2 Project wind-down is managed and documentation, records and approvals are handled in accordance with project plan and organisational policy and procedures.
- 2.3 Project stakeholders are debriefed, and infrastructure and resources are redeployed in accordance with organisational policy and procedures.
- 2.4 Project hand-over to user/s is completed in accordance with organisational procedures, and lessons learnt are documented and reported to stakeholders to assist in continuous improvement.
- 2.5 Stakeholders are advised of procedures and authorities for initial support to apply project results where relevant, and strategies are provided to manage long-term project momentum in accordance with organisational requirements.
The Range Statement provides information about the context in which the unit of competency is carried out. The variables cater for differences between States and Territories and the Commonwealth, and between organisations and workplaces. They allow for different work requirements, work practices and knowledge. The Range Statement also provides a focus for assessment. It relates to the unit as a whole. Text in bold italics in the Performance Criteria is explained here.
Stakeholders may include:
project sponsor/funding bodies
clients or customers (internal and external)
industry
other agencies
general public
relevant interest groups
unions
functional areas
the organisation's senior management
Ministers
project team
steering committee members
end user
supplier/service provider
Project plan will include some or all of:
acquisition strategies
budget and financial management strategy
contract management
cost estimates
evaluation criteria
expected outcomes/measurable benefits of the project
facilities
inclusions and exclusions from project
information/communication strategy
intellectual property strategies
milestones
objectives
outputs/project deliverables and their acceptance criteria
people plan including human resource management and human resource development
performance criteria/indicators
project control mechanisms
project implementation strategy
project governance strategy
purpose
quality assurance
quality control
quality standards for project
rationale
required project resources
resource management
risk management
roles and responsibilities
schedule/timeline
task/work breakdown structure (WBS)
Policy and procedures may include:
government legislation (Federal, State and Local) affecting organisation's administration such as:
public sector management acts
financial management and accounting legislation and regulations
privacy legislation
government and organisational guidelines and procedures relating to:
project governance
resourcing
security
strategic plans
recruitment
risk management
procurement guidelines
designation approvals
industrial agreements
environment and sustainability
Management of project wind-down may include:
risks
issues
assets
consultants
project team
support staff
Documentation may include:
project completion report
supplier performance reports
whole-of-life support plans
transfer documents
financial reports and acquittals
evaluation reports
transition plans
Approvals may be required from:
project sponsor/funding body
business owner of the project
program manager
line manager
project governance office/personnel in the organisation
chief executive officer, manager or management representative
customer or client
Stakeholders may include:
project sponsor/funding bodies
clients or customers (internal and external)
industry
other agencies
general public
relevant interest groups
unions
functional areas
the organisation's senior management
Ministers
project team
steering committee members
end user
supplier/service provider
Project plan will include some or all of:
acquisition strategies
budget and financial management strategy
contract management
cost estimates
evaluation criteria
expected outcomes/measurable benefits of the project
facilities
inclusions and exclusions from project
information/communication strategy
intellectual property strategies
milestones
objectives
outputs/project deliverables and their acceptance criteria
people plan including human resource management and human resource development
performance criteria/indicators
project control mechanisms
project implementation strategy
project governance strategy
purpose
quality assurance
quality control
quality standards for project
rationale
required project resources
resource management
risk management
roles and responsibilities
schedule/timeline
task/work breakdown structure (WBS)
Policy and procedures may include:
government legislation (Federal, State and Local) affecting organisation's administration such as:
public sector management acts
financial management and accounting legislation and regulations
privacy legislation
government and organisational guidelines and procedures relating to:
project governance
resourcing
security
strategic plans
recruitment
risk management
procurement guidelines
designation approvals
industrial agreements
environment and sustainability
Management of project wind-down may include:
risks
issues
assets
consultants
project team
support staff
Documentation may include:
project completion report
supplier performance reports
whole-of-life support plans
transfer documents
financial reports and acquittals
evaluation reports
transition plans
Approvals may be required from:
project sponsor/funding body
business owner of the project
program manager
line manager
project governance office/personnel in the organisation
chief executive officer, manager or management representative
customer or client
The Evidence Guide specifies the evidence required to demonstrate achievement in the unit of competency as a whole. It must be read in conjunction with the Unit descriptor, Performance Criteria, the Range Statement and the Assessment Guidelines for the Public Sector Training Package.
Units to be assessed together
Pre-requisite units that must be achieved prior to this unit:Nil
Co-requisite units that must be assessed with this unit:Nil
Co-assessed units that may be assessed with this unit to increase the efficiency and realism of the assessment process include, but are not limited to:
PSPETHC501B Promote the values and ethos of public service
PSPGOV502B Develop client services
PSPGOV503B Coordinate resource allocation and usage
PSPGOV504B Undertake research and analysis
PSPGOV505A Promote diversity
PSPGOV507A Undertake negotiations
PSPGOV512A Use complex workplace communication strategies
PSPGOV517A Coordinate risk management
PSPPM501B Design complex projects
PSPPM502B Manage complex projects
PSPPROC504A Finalise contracts
Overview of evidence requirements
In addition to integrated demonstration of the elements and their related performance criteria, look for evidence that confirms:
the knowledge requirements of this unit
the skill requirements of this unit
application of the Employability Skills as they relate to this unit (see Employability Summaries in Qualifications Framework)
reviewing and closing complex projects in a range of (3 or more) contexts (or occasions, over time)
Resources required to carry out assessment
These resources include:
legislation, guidelines, procedures and protocols relating to project close-out
workplace project documentation
scenarios and case studies
examples of project management tools suited to reasonably complex projects
Where and how to assess evidence
Valid assessment of this unit requires:
a workplace environment or one that closely resembles normal work practice and replicates the range of conditions likely to be encountered when reviewing and closing complex projects, including coping with difficulties, irregularities and breakdowns in routine
reviewing and closing complex projects in a range of (3 or more) contexts (or occasions, over time)
Assessment methods should reflect workplace demands, such as literacy, and the needs of particular groups, such as:
people with disabilities
people from culturally and linguistically diverse backgrounds
Aboriginal and Torres Strait Islander people
women
young people
older people
people in rural and remote locations
Assessment methods suitable for valid and reliable assessment of this competency may include, but are not limited to, a combination of 2 or more of:
case studies
demonstration
observation
portfolios
projects
questioning
scenarios
simulation or role plays
authenticated evidence from the workplace and/or training courses
For consistency of assessment
Evidence must be gathered over time in a range of contexts to ensure the person can achieve the unit outcome and apply the competency in different situations or environments
Units to be assessed together
Pre-requisite units that must be achieved prior to this unit:Nil
Co-requisite units that must be assessed with this unit:Nil
Co-assessed units that may be assessed with this unit to increase the efficiency and realism of the assessment process include, but are not limited to:
PSPETHC501B Promote the values and ethos of public service
PSPGOV502B Develop client services
PSPGOV503B Coordinate resource allocation and usage
PSPGOV504B Undertake research and analysis
PSPGOV505A Promote diversity
PSPGOV507A Undertake negotiations
PSPGOV512A Use complex workplace communication strategies
PSPGOV517A Coordinate risk management
PSPPM501B Design complex projects
PSPPM502B Manage complex projects
PSPPROC504A Finalise contracts
Overview of evidence requirements
In addition to integrated demonstration of the elements and their related performance criteria, look for evidence that confirms:
the knowledge requirements of this unit
the skill requirements of this unit
application of the Employability Skills as they relate to this unit (see Employability Summaries in Qualifications Framework)
reviewing and closing complex projects in a range of (3 or more) contexts (or occasions, over time)
Resources required to carry out assessment
These resources include:
legislation, guidelines, procedures and protocols relating to project close-out
workplace project documentation
scenarios and case studies
examples of project management tools suited to reasonably complex projects
Where and how to assess evidence
Valid assessment of this unit requires:
a workplace environment or one that closely resembles normal work practice and replicates the range of conditions likely to be encountered when reviewing and closing complex projects, including coping with difficulties, irregularities and breakdowns in routine
reviewing and closing complex projects in a range of (3 or more) contexts (or occasions, over time)
Assessment methods should reflect workplace demands, such as literacy, and the needs of particular groups, such as:
people with disabilities
people from culturally and linguistically diverse backgrounds
Aboriginal and Torres Strait Islander people
women
young people
older people
people in rural and remote locations
Assessment methods suitable for valid and reliable assessment of this competency may include, but are not limited to, a combination of 2 or more of:
case studies
demonstration
observation
portfolios
projects
questioning
scenarios
simulation or role plays
authenticated evidence from the workplace and/or training courses
For consistency of assessment
Evidence must be gathered over time in a range of contexts to ensure the person can achieve the unit outcome and apply the competency in different situations or environments