Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and maintain substation direct current systems

Install and maintain substation direct current systems

Unit of competency
National Code
UETDRSB007
State Code
OED63
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
14/10/2022
State Implementation and Classification
Approved Date
17/02/2023
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
17/02/2023
Nominal Hours
20
Description
This unit includes the skills and knowledge required to install and maintain substation direct current (d.c) systems in the electricity supply industry (ESI).It includes types, characteristics, maintenance requirements, installation procedures and common defects of batteries, chargers and associated control systems. The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to install and maintain substation d.c. systems
  • 1.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be done are reviewed and determined
  • 1.2 Work plan is obtained, confirmed and communicated with relevant personnel in accordance with workplace requirements
  • 1.3 Hazards are identified, risks assessed, and control measures identified and applied
  • 1.4 Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
  • 1.5 Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
  • 1.6 Materials required for work are determined and obtained in accordance with work plan and workplace requirements
  • 1.7 Liaison and communication issues with authorised personnel, authorities and clients are resolved to facilitate work, as required
  • 1.8 Worksite is prepared in accordance with the work plan and workplace requirements
2 Install and maintain substation d.c. systems
  • 2.1 Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
  • 2.2 Hazard control measures are monitored in accordance with workplace requirements
  • 2.3 Work permits are received and signed in accordance with workplace requirements
  • 2.4 Lifting, working at heights, working in confined spaces and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements
  • 2.5 Substation d.c. systems are installed in accordance with workplace requirements
  • 2.6 Substation d.c. systems are maintained in accordance with workplace requirements
  • 2.7 Incidents or unplanned events are responded to in accordance with workplace requirements
  • 2.8 Quality checks of work are undertaken in accordance with work plan and workplace requirements
3 Complete work and documentation
  • 3.1 Completed work is checked for compliance against the work plan and workplace requirements
  • 3.2 Work permits are signed off in accordance with workplace requirements
  • 3.3 Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
  • 3.4 Plant, tools and equipment are cleaned, checked and returned to storage, and surplus resources and materials are managed in accordance with workplace requirements
  • 3.5 Work records, reports and documentation are completed, and where relevant, appropriate personnel notified in accordance with workplace requirements
No information
No information
Replaces
State Code National Code Title Type
OBH07 UETTDRSB23 Install and maintain substation direct current systems Unit of competency