Unit of competency Outline
Date retreived
22/07/2026 2:36 PM AWST
22/07/2026 2:36 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain substation direct current systems
Install and maintain substation direct current systems
Unit of competency
National Code
UETTDRSB23
UETTDRSB23
State Code
OBH07
OBH07
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
27
Description
This unit involves the skills and knowledge required to install and maintain substation direct current systems in the electricity supply industry (ESI).
It includes installing and maintaining substation direct current (DC) systems such as main batteries, communication batteries, DC lighting systems, battery chargers, uninterrupted power supply (UPS) systems and associated control circuits in accordance with workplace procedures. It also includes diagnosing faults, replacing faulty equipment, conducting pre-commissioning/re-commissioning tests and interpreting test results against agreed specifications.
The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.
Other conditions may apply under State and Territory legislative and regulatory licensing requirement which must be confirmed prior to commencing this unit.
It includes installing and maintaining substation direct current (DC) systems such as main batteries, communication batteries, DC lighting systems, battery chargers, uninterrupted power supply (UPS) systems and associated control circuits in accordance with workplace procedures. It also includes diagnosing faults, replacing faulty equipment, conducting pre-commissioning/re-commissioning tests and interpreting test results against agreed specifications.
The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.
Other conditions may apply under State and Territory legislative and regulatory licensing requirement which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan to install and/or maintain substation d.c. systems
- 1.1 Work schedules, construction plans, drawings, workplace procedures and material lists are obtained and analysed
- 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
- 1.3 Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS)risks assessed and control measures prioritised, implemented and monitored in accordance with workplace procedures
- 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- 1.5 Risk control measures are identified, prioritised, implemented and evaluated against the work schedule
- 1.6 Equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- 1.7 Liaison and communication issues with authorised personnel, authorities, clients and land owners are resolved to facilitate work, as required
- 1.8 Personnel participating in work are fully briefed and responsibilities confirmed in accordance with workplace procedures
- 1.9 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
2 Carry out the installation and maintenance of substation d.c. systems
- 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and actioned to reduce incidents of accidents in accordance with workplace procedures
- 2.2 Cardiopulmonary resuscitation (CPR), rescue from live electrical apparatus and other related safety procedures are in place in accordance with job requirements and/or workplace procedures
- 2.3 Safe working documentation is acquired and requirements completed in accordance with workplace procedures
- 2.4 Requirements for lifting, climbing, working at heights, confined spaces and use of power tools/equipment are followed in accordance with workplace procedures
- 2.5 Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks are reported to immediate authorised personnel for directions in accordance with workplace procedures
- 2.6 Substation d.c. systems are installed safely to ensure completion in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
- 2.7 Installation of substation d.c. systems is performed in accordance with work schedules, job requirements and workplace procedures
- 2.8 Maintenance of substation d.c. systems is performed in accordance with work schedules, job requirements and workplace procedures
- 2.9 Installation and/or maintenance of substation d.c. systems are completed in agreed timeframes, to quality standards and with minimum waste in accordance with workplace procedures
- 2.10 Unplanned events or conditions are responded to in accordance with workplace procedures
- 2.11 Substation d.c. systems are performance tested in accordance with workplace procedures and job specifications
- 2.12 Quality checks of work are undertaken in accordance with industry standards and workplace procedures
3 Complete the installation and maintenance of substation d.c. systems
- 3.1 Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
- 3.2 Safe working documentation is surrendered and equipment made ready for service in accordance with workplace procedures, if required
- 3.3 Worksite is cleaned and confirmed safe in accordance with workplace procedures
- 3.4 Tools, equipment, surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- 3.5 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD733 | UETTDRSB23A | Install and maintain substation direct current systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OED63 | UETDRSB007 | Install and maintain substation direct current systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFN2 | UEE40620 | Certificate IV in Electrotechnology - Systems Electrician | Qualification |
| BFN0 | UEE30820 | Certificate III in Electrotechnology Electrician | Qualification |
| BHB2 | UET40521 | Certificate IV in ESI - Power Systems Substations | Qualification |
| BEV5 | UET40519 | Certificate IV in ESI - Power Systems Substations | Qualification |