Unit of competency Outline
Date retreived
22/07/2026 1:17 PM AWST
22/07/2026 1:17 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain guard rails
Install and maintain guard rails
Unit of competency
National Code
TLIB2097
TLIB2097
State Code
AVK70
AVK70
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
18
Description
This unit involves the skills and knowledge required to install and maintain guard rails in accordance with safeworking and regulatory requirements, and workplace procedures.It includes determining job requirements, installing guard rails and completing all required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Guard rails include guard rails installed on:level crossings and sharp curves to prevent derailmentunder bridges and near vulnerable structures to limit lateral movement of derailed wagons.Work is performed under minimal supervision, generally within a team environment. It involves the application of routine operational principles and procedures when installing and maintaining guard rails, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine job requirements
- 1.1 Worksite is identified
- 1.2 Hazards are identified, risks are assessed and control measures are implemented
- 1.3 Obstructions are cleared from gangways/flangeways to ensure safe passage of trains
- 1.4 Installation, replacement or repair method is selected in accordance with work requirements, rail industry standards and workplace procedures
- 1.5 Plant, equipment and materials are prepared for work
2 Install guard rail
- 2.1 Existing guard rail is removed, as required, to enable fitting of new rail
- 2.2 New or replacement guard rail is installed to required standards using suitable equipment and fastening system to restore functionality of guard rail
- 2.3 Final job is checked for compliance to required standards to enable services to be restored safely
3 Complete documentation
- 3.1 Required documentation procedures and processes are confirmed
- 3.2 Documentation is filled in legibly and proofread
- 3.3 Documentation is processed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D4966 | TLIB2097A | Install and maintain guard rails | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHV6 | TLI37122 | Certificate III in Rail Infrastructure | Qualification |
| BGM7 | TLI27120 | Certificate II in Rail Infrastructure | Qualification |
| BGM6 | TLI37120 | Certificate III in Rail Infrastructure | Qualification |
| AWT3 | TLI21315 | Certificate II in Rail Infrastructure | Qualification |
| BHI6 | TLI37121 | Certificate III in Rail Infrastructure | Qualification |
| BHH8 | TLI27121 | Certificate II in Rail Infrastructure | Qualification |
| AWQ2 | TLI32515 | Certificate III in Rail Infrastructure | Qualification |
| BHH1 | TLI32121 | Certificate III in Rail Structures | Qualification |
| AWT7 | TLI32115 | Certificate III in Rail Structures | Qualification |
| AWS4 | TLI32915 | Certificate III in Tram or Light Rail Infrastructure | Qualification |
| BDR5 | TLI32918 | Certificate III in Tram or Light Rail Infrastructure | Qualification |