Unit of competency Outline

Date retreived
22/07/2026 8:47 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Develop action plans to retrofit existing buildings for energy efficiency

Develop action plans to retrofit existing buildings for energy efficiency

Unit of competency
National Code
CPCSUS5002
State Code
OCM05
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
030905 - Building Services Engineering
Original Release Date
01/06/2021
Nominal Hours
35
Description
This unit of competency specifies the skills and knowledge required to develop plans to improve the energy efficiency of an existing building. It includes researching appropriate products, materials and systems and engaging with clients and stakeholders when retrofitting a building.The unit of competency applies to building designers, tradespeople and building project managers involved in the design or development of retrofits for energy efficiency.This unit of competency applies to those who apply skills and knowledge to identify, analyse and evaluate approaches to sometimes unpredictable problems.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan retrofit processes.
  • 1.1 Discuss client’s use of the building and specific expectations of energy efficient retrofit priorities and incorporate into planning.
  • 1.2 Initiate energy assessment or review report from a prior assessment and discuss with key stakeholders to determine energy conservation measures.
  • 1.3 Provide a client with an overview of recommended processes and information relevant to generating an energy efficient retrofit.
2 Evaluate opportunities to improve energy conservation and efficiency of an existing building.
  • 2.1 Review and evaluate recommendations from energy efficiency assessor for input into the retrofit action plan.
  • 2.2 Identify limitations and obstacles involved in the energy efficiency upgrade of a building and develop appropriate solutions.
  • 2.3 Identify and manage risks of retrofitting an existing building for improved energy efficiency, including possible installation of mechanical ventilation systems.
  • 2.4 Develop and cost strategies that provide a measurable increase in the operational energy efficiency of an existing building.
  • 2.5 Assess structural adequacy of the existing building to determine appropriateness of retrofit solutions for energy efficiency.
3 Research and select energy efficient materials, products and systems.
  • 3.1 Research materials, products and systems specifications for appropriateness to the energy efficiency for the existing building.
  • 3.2 Source literature and consult with manufacturer representatives to identify installation and operational specifications.
  • 3.3 Check compliance requirements for selecting and installing materials, products and systems.
  • 3.4 Assess thermal and acoustic insulation of the building to determine energy efficiency rating.
  • 3.5 Determine quality of insulation and installation to improve insulating properties of the building.
4 Finalise a retrofit action plan.
  • 4.1 Develop final a retrofit action plan to comply with organisational procedures.
  • 4.2 Explain projected benefits of undertaking each of the proposed retrofit measures to a client.
  • 4.3 Obtain client sign-off and finalise documentation of the agreed plan.
No information
No information
Replaces
State Code National Code Title Type
WI779 CPCSUS5002A Develop action plans to retrofit existing buildings for energy efficiency Unit of competency