Unit of competency Outline
Date retreived
22/07/2026 8:17 PM AWST
22/07/2026 8:17 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply texture coat paint finishes by brush, roller and spray
Apply texture coat paint finishes by brush, roller and spray
Unit of competency
National Code
CPCCPD3023A
CPCCPD3023A
State Code
D7387
D7387
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040325 - Painting, Decorating And Sign Writing
Original Release Date
02/04/2014
Nominal Hours
24
Description
This unit of competency specifies the outcomes required to apply texture coat paint finishes to different surfaces by using brush, roller and spray.The unit includes planning and preparation for the work, preparation of the work area and materials, application of the texture coat paint and completion of clean-up activities.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Plant, tools and equipment are selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Prepare materials and application area.
- 2.1. Area is set up for application processes to suit application system being used.
- 2.2. Adjoining surfaces to application area are protected by masking off or covering, prior to application of texture coat paint.
- 2.3. Adequate ventilation to application area is provided to maintain a safe environment.
- 2.4. Measures are taken to ensure application area remains free of dust and foreign matter.
- 2.5. Application system and equipment are prepared for use.
- 2.6. Fittings are checked for function and security prior to use in accordance with manufacturer recommendations.
- 2.7. Texture coat paint is mixed and adjusted to allow for application process in accordance with manufacturer recommendations, plans and specification.
3. Apply texture coat by brush and roller.
- 3.1. Application equipment is used in accordance with manufacturer recommendations and job specifications.
- 3.2. Texture coat paint is applied to surface using correct application technique to achieve an even finish with opacity and sheen level in accordance with the job specification.
- 3.3. Defects in coating are identified and corrective action is taken to achieve the required finish in accordance with job specification.
4. Apply texture coat by spray.
- 4.1. Spray equipment is operated to standard operating procedures in accordance with manufacturer recommendations.
- 4.2. Texture coat paint is applied to surface using correct application technique to achieve an even finish with opacity and sheen level in accordance with the job specification.
- 4.3. Defects in coating are identified and corrective action taken to achieve the required paint finish in accordance with the job specification.
5. Clean up.
- 5.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 5.2. Paint waste, water and solvents used in cleaning painting equipment are disposed of in an environmentally sustainable manner and in accordance with relevant legislative requirements
- 5.3. Paint waste, water and solvents used in cleaning painting equipment are disposed of in an environmentally sustainable manner and in accordance with relevant legislative requirements
- 5.4. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to the application of texture coat paint
relevant Australian standards
safe work procedures relating to the application of texture coat paint
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
electrical and fire and/or explosion from combustible materials
falling objects
lighting
manual handling
power cables, including overhead service trays, cables and conduits
restricted access barriers
solvents, lead, chemicals, fumes/gases
surrounding structures
traffic control
trip hazards
work access platforms
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others, work site visitors and the public
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
brooms
brushes
mixers
roller equipment
sprays
vacuum cleaners
may include:
compressors
hopper guns
hoses and fittings
mobile scaffold
stepladders
trestles and planks.
Quality requirements include:
internal company quality policy and standards
manufacturer specifications, where specified
relevant regulations, including Australian standards
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
sedimentation control
low odour and emissions
vibration
waste management.
Application processes:
is to conform with AS2311 The Painting of Buildings.
Application of texture coat paint:
is to be by:
brush
roller
may be by:
spray
other application system.
Texture coat paint finishes:
include high-build (acrylic or styrene/acrylic) coatings
may include proprietary products or lines.
Surface for application of textured paint finishes includes:
brick and masonry
fibrous cement sheeting
off-form concrete
paper-faced plasterboard
tilt-up concrete slabs.
Paint waste, water and solvents disposal includes:
use of manual and machine environmentally sustainable cleaning methods
cleaning water re-cycling or professional disposal
solid waste disposal requirements
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to the application of texture coat paint
relevant Australian standards
safe work procedures relating to the application of texture coat paint
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
electrical and fire and/or explosion from combustible materials
falling objects
lighting
manual handling
power cables, including overhead service trays, cables and conduits
restricted access barriers
solvents, lead, chemicals, fumes/gases
surrounding structures
traffic control
trip hazards
work access platforms
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others, work site visitors and the public
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
brooms
brushes
mixers
roller equipment
sprays
vacuum cleaners
may include:
compressors
hopper guns
hoses and fittings
mobile scaffold
stepladders
trestles and planks.
Quality requirements include:
internal company quality policy and standards
manufacturer specifications, where specified
relevant regulations, including Australian standards
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
sedimentation control
low odour and emissions
vibration
waste management.
Application processes:
is to conform with AS2311 The Painting of Buildings.
Application of texture coat paint:
is to be by:
brush
roller
may be by:
spray
other application system.
Texture coat paint finishes:
include high-build (acrylic or styrene/acrylic) coatings
may include proprietary products or lines.
Surface for application of textured paint finishes includes:
brick and masonry
fibrous cement sheeting
off-form concrete
paper-faced plasterboard
tilt-up concrete slabs.
Paint waste, water and solvents disposal includes:
use of manual and machine environmentally sustainable cleaning methods
cleaning water re-cycling or professional disposal
solid waste disposal requirements
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
prepare and apply to specification texture coat paints using brush and roller and either spray or one other applicator system, to a minimum of:
one complete wall a minimum of 5 square metre with 2 hard edges
one complete wall, ceiling to floor including an internal corner (e.g. wall junction and ceiling/wall junction)
one complete window reveal
dispose of all paint types in an environmentally sustainable way compliant with relevant local legislation and regulations
clean and store painting equipment using environmentally sustainable methods and work practices including waste reticulation systems.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
prepare and apply to specification texture coat paints using brush and roller and either spray or one other applicator system, to a minimum of:
one complete wall a minimum of 5 square metre with 2 hard edges
one complete wall, ceiling to floor including an internal corner (e.g. wall junction and ceiling/wall junction)
one complete window reveal
dispose of all paint types in an environmentally sustainable way compliant with relevant local legislation and regulations
clean and store painting equipment using environmentally sustainable methods and work practices including waste reticulation systems.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9472 | CPCCPD3003A | Apply texture coat paint finishes by brush, roller and spray | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCQ12 | CPCCPD3023 | Apply texture coat paint finishes by brush, roller and spray | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZM4 | CUA30415 | Certificate III in Live Production and Services | Qualification |
| J696 | CUA30413 | Certificate III in Live Production and Services | Qualification |
| AZO0 | CUA40415 | Certificate IV in Live Production and Technical Services | Qualification |
| 3716 | 52659WA | Certificate III in Painting (Housing) | Accredited course |
| D395 | CPC30611 | Certificate III in Painting and Decorating | Qualification |