Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement erosion and sediment control measures
Implement erosion and sediment control measures
Unit of competency
National Code
AHCSAW302A
AHCSAW302A
State Code
D7236
D7236
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
13/10/2014
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
13/10/2014
Nominal Hours
50
Description
This unit covers the construction/installation and maintenance of a range of measures specified on erosion and sediment control plans and defines the standard required to: select and prepare equipment; confirm the details of work; identify survey pegs and site indicators; construct earthworks in line with the plan; install erosion and sediment control products and materials; carry out repairs and maintenance procedures.
Notes
Elements and Performance Criteria
1. Prepare for implementation and construction
- 1.1. Erosion and sediment control plan and schedule of works match site conditions.
- 1.2. Survey pegs and site indicators are identified on site.
- 1.3. Equipment and tools are matched to program works and terrain on site.
- 1.4. Work readiness of selected equipment and tools are verified in line with contractor policy.
- 1.5. Materials are selected to complete proposed works in line with construction schedule.
2. Carry out implementation and construction
- 2.1. Earthworks are constructed in accordance with details specified in the plan and to industry standards.
- 2.2. Erosion and sediment control products and materials are installed in accordance with manufacturer's recommendation and industry guidelines and plans.
3. Carry out repairs and maintenance procedures
- 3.1. Site works maintenance inspection schedule is applied to reinstate operating effectiveness of erosion and sediment control measures on site.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Erosion control measures may include:
site management
land shaping
batter stabilisation
banks and channels
level spreader
revegetation
waterways
check dams
bank and channel linings
grade stabilising structures
outlet protection structures
stormwater detention measures
dust control
rural road&track crossbank and crossfall.
Sediment control measures may include:
sediment basins
sediment traps
sediment filters
excavated sediment traps
straw bale
stormwater inlet sediment traps
sediment fence
straw bale
geotextile fabric
vegetation strips.
The range statement relates to the unit of competency as a whole.
Erosion control measures may include:
site management
land shaping
batter stabilisation
banks and channels
level spreader
revegetation
waterways
check dams
bank and channel linings
grade stabilising structures
outlet protection structures
stormwater detention measures
dust control
rural road&track crossbank and crossfall.
Sediment control measures may include:
sediment basins
sediment traps
sediment filters
excavated sediment traps
straw bale
stormwater inlet sediment traps
sediment fence
straw bale
geotextile fabric
vegetation strips.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
select and prepare equipment
confirm the details of work
identify survey pegs and site indicators
construct earthworks in line with the plan
install erosion and sediment control products and materials
carry out repairs and maintenance procedures.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
select and prepare equipment
confirm the details of work
identify survey pegs and site indicators
construct earthworks in line with the plan
install erosion and sediment control products and materials
carry out repairs and maintenance procedures.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S2614 | RTD3212A | Implement erosion and sediment control measures | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAN92 | AHCSAW302 | Implement erosion and sediment control measures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D480 | AHC31410 | Certificate III in Conservation and Land Management | Qualification |
| D490 | AHC32310 | Certificate III in Conservation Earthworks | Qualification |
| AZJ9 | BSB42315 | Certificate IV in Environmental Management and Sustainability | Qualification |
| J611 | FPI30113 | Certificate III in Forest Growing and Management | Qualification |
| J465 | FPI30111 | Certificate III in Forest Growing and Management | Qualification |
| BAK4 | FWP30116 | Certificate III in Forest Growing and Management | Qualification |
| D483 | AHC31710 | Certificate III in Natural Area Restoration | Qualification |
| D621 | SFI30311 | Certificate III in Seafood Industry (Environmental Management Support) | Qualification |
| AD576 | FWPSS00024 | Skill set for soil and water protection (roading) | Skill set |