Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and test operations of marine auxiliary systems
Install and test operations of marine auxiliary systems
Unit of competency
National Code
MEM25012B
MEM25012B
State Code
W5710
W5710
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
18/06/2009
Field of Education
031701 - Maritime Engineering
Original Release Date
18/06/2009
Nominal Hours
54
Description
This unit covers installing and testing marine auxiliary systems. Where installation only is required, Unit MEM25015A (Assemble and install equipment and accessories/ancillaries) should be selected.
Notes
Elements and Performance Criteria
1. Determine job requirements
- 1.1. Job requirements are established from plans, specifications, verbal instructions or visual inspections.
- 1.2. Installation materials are identified.
- 1.3. Compatibility of surface and fitting materials is identified.
- 1.4. Installation site of system is identified.
2. Select auxiliary system
- 2.1. Auxiliary system is selected in accordance with job requirements.
- 2.2. Material structure and installation procedures are identified.
- 2.3. Associated installation/assembly, plans/instruction are identified and verified.
3. Install auxiliary system
- 3.1. Appropriate tools for specified installation are selected.
- 3.2. Where applicable, structural area is cut to suit installation requirements.
- 3.3. Where applicable, structural reinforcement is fitted to suit job requirement.
- 3.4. Structural area is prepared for surface preparation.
- 3.5. Coating sealants and/or isolation materials are applied to suit job requirements.
- 3.6. Fastening methods are applied to suit job application.
- 3.7. Installation procedures are applied in accordance with job specification.
- 3.8. Clean work practices are applied.
4. Test operation of auxiliary system
- 4.1. Pre-test checks are applied and verified before standard testing procedures are actioned.
- 4.2. Test operation procedures are identified and verified.
- 4.3. Where required, test equipment is correctly set up and used in accordance with testing practice.
- 4.4. System is tested in accordance with specified operational procedures.
- 4.5. Faults are recorded/reported to appropriate authorities.
- 4.6. Faults are rectified and re-tested for correct operation.
- 4.7. Final test operation is recorded and documented according to standard operating procedures.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Test equipment
Mechanical, pneumatic/electro-pneumatic, electronic (analog/digital) and associated instruments that measure variables such as temperature, pressure, flow rate, levels, light, density or any other process variable
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Test equipment
Mechanical, pneumatic/electro-pneumatic, electronic (analog/digital) and associated instruments that measure variables such as temperature, pressure, flow rate, levels, light, density or any other process variable
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to install and test operations of marine auxiliary systems. Competency in this unit cannot be claimed until all prerequisites have been satisfied.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.
Context of and specific resources for assessment
This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.
This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with installing and testing operations of marine auxiliary systems, or other units requiring the exercise of the skills and knowledge covered by this unit.
Method of assessment
Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.
Guidance information for assessment
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to install and test operations of marine auxiliary systems. Competency in this unit cannot be claimed until all prerequisites have been satisfied.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.
Context of and specific resources for assessment
This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.
This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with installing and testing operations of marine auxiliary systems, or other units requiring the exercise of the skills and knowledge covered by this unit.
Method of assessment
Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.
Guidance information for assessment
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAT61 | MEM25012 | Install and test operations of marine auxiliary systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W245 | MEM40105 | Certificate IV in Engineering | Qualification |
| W233 | MEM20105 | Certificate II in Engineering | Qualification |
| W247 | MEM50105 | Diploma of Engineering - Advanced Trade | Qualification |
| W236 | MEM30105 | Certificate III in Engineering - Production Systems | Qualification |
| W234 | MEM20205 | Certificate II in Engineering - Production Technology | Qualification |
| W242 | MEM30705 | Certificate III in Marine Craft Construction | Qualification |