Unit of competency Outline

Date retreived
22/07/2026 9:11 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and test operations of marine auxiliary systems

Install and test operations of marine auxiliary systems

Unit of competency
National Code
MEM25012
State Code
OAT61
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
26/06/2019
State Implementation and Classification
Approved Date
Field of Education
031701 - Maritime Engineering
Original Release Date
Nominal Hours
54
Description
This unit of competency defines the skills and knowledge required to install and test marine auxiliary systems.Site locations can include external and internal locations for foundations, footings, beds and frameworks completed prior to installation and commissioning and tasks can be undertaken in a workshop/site, moored or in a sea-trial situation.Where installation only is required unit MEM25015 Assemble and install equipment and accessories/ancillaries should be selected.No licensing, legislative or certification requirements apply to this unit at the time of publication. Band: AUnit Weight: 6
Notes
Elements and Performance Criteria
1 Determine job requirements
  • 1.1 Follow standard operating procedures (SOPs)
  • 1.2 Comply with work health and safety (WHS) requirements at all times
  • 1.3 Use appropriate personal protective equipment (PPE) in accordance with SOPs
  • 1.4 Identify job requirements from specifications, job sheets or work instructions
2 Select auxiliary system
  • 2.1 Identify installation and compatibility of surface and fitting materials
  • 2.2 Identify installation site of system
  • 2.3 Select auxiliary system in accordance with job requirements
  • 2.4 Identify material structure and installation procedures
  • 2.5 Identify and verify associated installation/assembly plans/instruction
3 Install auxiliary system
  • 3.1 Select appropriate tools for specified installation
  • 3.2 Cut structural area to suit installation requirements, where applicable
  • 3.3 Fit structural reinforcement to suit job requirement, where applicable
  • 3.4 Prepare structural area for surface preparation
  • 3.5 Apply coating sealants and/or isolation materials to suit job requirements
  • 3.6 Apply fastening methods
  • 3.7 Apply installation procedures in accordance with job specification
  • 3.8 Apply clean work practices
4 Test operation of auxiliary system
  • 4.1 Apply pre-test checks and verify before standard testing procedures are actioned
  • 4.2 Identify and verify test operation procedures
  • 4.3 Set up and use test equipment in accordance with testing practice
  • 4.4 Test system in accordance with specified operational procedures
  • 4.5 Record/report faults to appropriate authorities
  • 4.6 Rectify faults and re-test for correct operation
  • 4.7 Record and document final test operation according to SOPs
No information
No information
Replaces
State Code National Code Title Type
W5710 MEM25012B Install and test operations of marine auxiliary systems Unit of competency