Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install artwork

Install artwork

Unit of competency
National Code
MSFPF3017
State Code
OAI35
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
03/12/2018
State Implementation and Classification
Approved Date
22/05/2019
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
22/05/2019
Nominal Hours
25
Description
This unit describes the skills and knowledge required to install framed artwork in domestic or commercial situations, positioned singly or grouped in conjunction with other pieces of artwork, or in an adjustable gallery system. It includes the requirement to install heavy items as part of a team.This unit applies to any individual installing artwork. Individuals use discretion, judgement and specialised knowledge to determine hanging constraints and select appropriate tools and equipment.No licensing or certification requirements exist at the time of publication. Relevant legislation, industry standards and codes of practice within Australia must be applied.
Notes
Elements and Performance Criteria
1. Confirm installation requirements
  • 1.1 Read work order and identify installation requirements
  • 1.2 Identify and follow work health and safety requirements throughout the work
  • 1.3 Weigh and view artwork to be installed to determine design characteristics and physical dimensions and shape
  • 1.4 Develop and action an installation plan suited to the scope of the job and gain approvals from customer and relevant authorities
2. Prepare for installation
  • 2.1 Specifications and/or plans are read and interpreted
  • 2.2 Identify and order attachments, fittings, hanging/fixing devices and display features
  • 2.3 Select and check tools and equipment for quality, serviceability and safety prior to use
  • 2.4 Prepare artwork to be installed for safe and secure transit to worksite
  • 2.5 Plan the installation sequence suited to the job and identify the need for team installation
3. Hang artwork
  • 3.1 Identify and follow safe manual handling requirements
  • 3.2 Follow agreed installation plan and task sequence
  • 3.3 Take accurate measurements to ensure correct placement of artwork
  • 3.4 Install attachments, fittings, hanging and/or fixing devices and display features in accordance with identified requirements and constraints
  • 3.5 Position artwork in accordance with work requirement
  • 3.6 Check completed installation for security and against required specifications
4. Finalise installation
  • 4.1 Obtain and customer approval for installation in accordance with workplace procedures
  • 4.2 Clean work area and safely dispose of rubbish
  • 4.3 Accurately complete other required workplace documentation
  • 4.4 Clean, store and recycle tools, equipment and unused materials in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WI596 MSFPF3009 Install artwork Unit of competency
State Code National Code Title Type
BED4 MSF30518 Certificate III in Picture Framing Qualification