Unit of competency Outline
Date retreived
22/07/2026 12:12 PM AWST
22/07/2026 12:12 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install artwork
Install artwork
Unit of competency
National Code
MSFPF3009
MSFPF3009
State Code
WI596
WI596
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
19/06/2014
Nominal Hours
25
Description
This unit of competency covers installing framed artwork in domestic or commercial situations, positioned singly or grouped in conjunction with other pieces of artwork, or in an adjustable gallery system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan installation
- 1.1 Work to be undertaken is identified from work/job/customer order
- 1.2 Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work
- 1.3 Artwork to be installed is weighed and viewed to determine artistic and design characteristics and physical dimensions and shape
- 1.4 Site for installation is visited and location, wall and ceiling composition, load bearing ability and method of construction fittings, attachments, hanging/fixing devices and any display features determined
- 1.5 If necessary, a plan for installation is developed and necessary regulatory approvals for installation sought
- 1.6 Customer approval of plan is gained
2 Prepare for installation
- 2.1 Specifications and/or plans are read and interpreted
- 2.2 Attachments, fittings, hanging/fixing devices and display features are identified and ordered
- 2.3 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 2.4 Artwork to be installed is prepared for safe and secure transit to worksite
- 2.5 Sequence of work is planned
3 Install artwork
- 3.1 Instructions and sequence for installation are followed
- 3.2 Attachments, fittings, hanging/fixing devices and display features are organised and installed in accordance with relevant industry and workplace requirements
- 3.3 Artwork is positioned in accordance with work requirement
- 3.4 Completed installation is checked to ensure it meets required specifications
- 3.5 Customer approval of installation is gained
4 Complete housekeeping
- 4.1 Unused materials are stored or recycled as required
- 4.2 Tools and equipment are cleaned and stored appropriately
- 4.3 Work area is cleaned and rubbish disposed of appropriately
- 4.4 Workplace documentation is completed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8737 | LMFPF3009B | Install artwork | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAI35 | MSFPF3017 | Install artwork | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J733 | MSF30513 | Certificate III in Picture Framing | Qualification |