Unit of competency Outline
Date retreived
22/07/2026 1:02 PM AWST
22/07/2026 1:02 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Set up and dismantle temporary work location and equipment
Set up and dismantle temporary work location and equipment
Unit of competency
National Code
AURMGA2001
AURMGA2001
State Code
WF259
WF259
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
18/07/2013
Field of Education
030717 - Plant And Machine Operations
Original Release Date
18/07/2013
Nominal Hours
16
Description
This unit of competency describes the skills and knowledge required to set up temporary work location and equipment according to team requirements.It requires the ability to set up and dismantle temporary shelter and equipment storage, layout equipment, erect team promotional signage and set up functional workspace.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare site
- 1.1. Interpret site information and requirements and confirm with site supervisor/circuit manager
- 1.2. Consider security and confidentiality issues and select risk management measures
- 1.3. Identify potential hazards and select risk management measures
- 1.4. Consider path of movement (obstacles, hazards and safety conditions) in positioning of equipment and tooling and take measures to eliminate hazards
- 1.5. Observe workplace health and safety (WHS) requirements, including equipment and system isolation requirements, and observe personal protection needs throughout the work
2. Assemble temporary work location
- 2.1. Unload equipment and tooling from transporters in accordance with team requirements
- 2.2. Assemble, erect and secure temporary work shelter and associated fittings in accordance with shelter manufacturer/component supplier procedure, team requirements and event supplementary regulations
3. Position equipment and tooling
- 3.1. Assemble equipment according to manufacturer/component supplier specifications
- 3.2. Position equipment according to team requirements, WHS requirements, controlling body rules, category rules and supplementary regulations
- 3.3. Identify, fit and install required protective equipment in accordance with manufacturer/component supplier and team guidelines
- 3.4. Monitor effectiveness of area layout during use and make recommendations for changes to appropriate persons
- 3.5. Identify problems with the work area and report to appropriate persons
4. Dismantle temporary work location
- 4.1. Clean, dismantle and pack temporary work shelter in preparation for transportation in accordance with team procedures
- 4.2. Account for tooling and equipment and maintain and pack in preparation for transportation in accordance with team procedures
- 4.3. Load shelter, equipment and tooling on transporters in accordance with team procedures
- 4.4. Clean and inspect work area for serviceable condition in accordance with local requirements
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Ancillary set-up
Ancillary set-up may include:
erection of temporary wheel alignment and weighing equipment
installation of pit wall resources:
data acquisition beacon
pit board
stop watches
links
cabling
Temporary work locations
Temporary work locations may include
specified pit areas (e.g. pit lane and pit bay)
service areas for rally and boating events
Setting up a temporary work location
Setting up a temporary work location may include:
installation of floor matting
set-up of tables and benches
positioning of tooling and equipment, including category specific resources, such as:
nitrogen bottles
tyre warmers
power leads
jacking systems
installation of computing and data acquisition equipment
installation of firefighting and environmental protection equipment, including:
drip/spill trays
oil absorbent material
cleaning agents
disposal containers
erection of promotional signage and security barriers
WHS requirements
WHS requirements are to be in accordance with applicable commonwealth, state or territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
hazard and risk control
elimination of hazardous materials and substances
manual handling, including shifting, lifting and carrying
emergency procedures
team insurance requirements
material safety management systems
controlling body requirements
manufacturer/component supplier specifications
local safe operating procedures
Legislative requirements
Legislative requirements are to be in accordance with applicable commonwealth, state or territory legislation, regulations, certification requirements and codes of practice, and may include:
award and enterprise agreements
industrial relations
Australian standards
confidentiality and privacy
WHS
the environment
equal opportunity
anti-discrimination
duty of care
health regulations
Tooling and equipment
Tooling and equipment may include:
lifting devices
basic construction tooling:
hammers
pliers
zip ties
tape
step-ladder
spanners
screwdrivers
Material
Materials may include:
light gauge tubing
synthetic panelling
wire
rope and cord
Information and procedures
Information and procedures may include:
controlling body rules, category rules and supplementary regulations
team procedures and standards related to:
setting up a temporary work location
reporting and communication
use of tooling and equipment
emergency service contacts and team persons emergency contacts
team emergency and event procedures for accidents or injury
work instructions, including worksheets, material safety data sheets (MSDS), assembly procedures, plans, drawings, designs and checklists
manufacturer/component supplier specifications and application procedures for test equipment and materials
safety body publications
environmental, hazardous chemicals and dangerous goods legislation and local requirements relating to the disposal and use of fuels, lubricants, coolants and cleaning agents
building codes
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Ancillary set-up
Ancillary set-up may include:
erection of temporary wheel alignment and weighing equipment
installation of pit wall resources:
data acquisition beacon
pit board
stop watches
links
cabling
Temporary work locations
Temporary work locations may include
specified pit areas (e.g. pit lane and pit bay)
service areas for rally and boating events
Setting up a temporary work location
Setting up a temporary work location may include:
installation of floor matting
set-up of tables and benches
positioning of tooling and equipment, including category specific resources, such as:
nitrogen bottles
tyre warmers
power leads
jacking systems
installation of computing and data acquisition equipment
installation of firefighting and environmental protection equipment, including:
drip/spill trays
oil absorbent material
cleaning agents
disposal containers
erection of promotional signage and security barriers
WHS requirements
WHS requirements are to be in accordance with applicable commonwealth, state or territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
hazard and risk control
elimination of hazardous materials and substances
manual handling, including shifting, lifting and carrying
emergency procedures
team insurance requirements
material safety management systems
controlling body requirements
manufacturer/component supplier specifications
local safe operating procedures
Legislative requirements
Legislative requirements are to be in accordance with applicable commonwealth, state or territory legislation, regulations, certification requirements and codes of practice, and may include:
award and enterprise agreements
industrial relations
Australian standards
confidentiality and privacy
WHS
the environment
equal opportunity
anti-discrimination
duty of care
health regulations
Tooling and equipment
Tooling and equipment may include:
lifting devices
basic construction tooling:
hammers
pliers
zip ties
tape
step-ladder
spanners
screwdrivers
Material
Materials may include:
light gauge tubing
synthetic panelling
wire
rope and cord
Information and procedures
Information and procedures may include:
controlling body rules, category rules and supplementary regulations
team procedures and standards related to:
setting up a temporary work location
reporting and communication
use of tooling and equipment
emergency service contacts and team persons emergency contacts
team emergency and event procedures for accidents or injury
work instructions, including worksheets, material safety data sheets (MSDS), assembly procedures, plans, drawings, designs and checklists
manufacturer/component supplier specifications and application procedures for test equipment and materials
safety body publications
environmental, hazardous chemicals and dangerous goods legislation and local requirements relating to the disposal and use of fuels, lubricants, coolants and cleaning agents
building codes
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently:
interpret and apply team requirements, controlling body and category rules and supplementary regulations
correctly apply and use safety equipment and personal protective equipment
follow task instructions, operating procedures and inspection processes to:
minimise the risk of injury to self and others
prevent damage to competition vehicle or equipment
achieve required outcomes within team time and quality standards
correctly set up and dismantle a temporary work location on a minimum of three (3) occasions, in at least two (2) different locations, and complete the following:
identify/confirm temporary location layout
establish the area layout
confirm effectiveness of area layout
work effectively with others
modify activities to cater for variations in workplace context and environment.
Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or a simulated environment that reflects as far as possible the actual working environment.
Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints.
Assessment is to comply with relevant regulatory requirements, including specified Australian standards.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
The following resources should be made available:
an area to set-up a temporary work location
standard operating procedures
tools and equipment.
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of this Training Package.
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of Required Skills and Knowledge.
Assessment methods must be by direct observation of tasks and include questioning on Required Skills and Knowledge to ensure its correct interpretation and application.
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process.
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role.
Guidance information for assessment
Assessment processes and techniques must be culturally sensitive and appropriate to the language and literacy capacity of the candidate and the work being performed.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently:
interpret and apply team requirements, controlling body and category rules and supplementary regulations
correctly apply and use safety equipment and personal protective equipment
follow task instructions, operating procedures and inspection processes to:
minimise the risk of injury to self and others
prevent damage to competition vehicle or equipment
achieve required outcomes within team time and quality standards
correctly set up and dismantle a temporary work location on a minimum of three (3) occasions, in at least two (2) different locations, and complete the following:
identify/confirm temporary location layout
establish the area layout
confirm effectiveness of area layout
work effectively with others
modify activities to cater for variations in workplace context and environment.
Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or a simulated environment that reflects as far as possible the actual working environment.
Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints.
Assessment is to comply with relevant regulatory requirements, including specified Australian standards.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
The following resources should be made available:
an area to set-up a temporary work location
standard operating procedures
tools and equipment.
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of this Training Package.
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of Required Skills and Knowledge.
Assessment methods must be by direct observation of tasks and include questioning on Required Skills and Knowledge to ensure its correct interpretation and application.
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process.
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role.
Guidance information for assessment
Assessment processes and techniques must be culturally sensitive and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7595 | AURM240172B | Set up and dismantle temporary work location and equipment | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXC19 | AURMGA001 | Set up and dismantle temporary work location and equipment at motor sport events | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J397 | AUR30912 | Certificate III in Motorsport Technology | Qualification |
| J379 | AUR21012 | Certificate II in Motorsport Technology | Qualification |