Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install ground support

Install ground support

Unit of competency
National Code
RIIUMM201D
State Code
WH700
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030303 - Mining Engineering
Original Release Date
29/05/2014
Nominal Hours
60
Description
This unit describes a participant’s skills and knowledge required to install ground support in Metalliferous mining. This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to install ground support
  • 1.1. Access, interpret and apply installation of ground support documentation and ensure the work activity is compliant
  • 1.2. Obtain, interpret, clarify and confirm work instructions
  • 1.3. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  • 1.4. Select, and check for faults, equipment/tools for the activity
  • 1.5. Arrange for delivery of ground support materials to site
  • 1.6. Inspect and assess site conditions and determine if scaling is required and take action
  • 1.7. Conduct equipment pre-start checks and start up procedures
  • 1.8. Identify, address and report environmental issues, potential risks and hazards
  • 1.9. Inspect and assess appropriateness of ground control mechanism/plan to ensure safety of site
  • 1.10. Use approved dust suppression and extraction equipment/methods
2. Install ground support
  • 2.1. Assemble and install reinforcement components according to ground control plan
  • 2.2. Install reinforcement components with appropriate fixative
  • 2.3. Install reinforcement components following contour of ground and according to ground conditions
  • 2.4. Tension external reinforcement components according to ground control conditions
3. Conduct housekeeping activities
  • 3.1. Clear work area and dispose of or recycle materials
  • 3.2. Clean and maintain condition of equipment, ensure suitability for use, and address/report issues
  • 3.3. Manage and/or report hazards, and maintain a safe working environment
  • 3.4. Process and maintain written records
No information
No information
Replaces
State Code National Code Title Type
WB308 RIIUMM201A Install ground support Unit of competency