Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Set up machine for envelope manufacture
Set up machine for envelope manufacture
Unit of competency
National Code
ICPCBF393
ICPCBF393
State Code
AUN24
AUN24
TGA Status
Deleted
Deleted
DTWD Status
Transition (Deleted)
Transition (Deleted)
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
030103 - Printing
Original Release Date
16/09/2015
Nominal Hours
30
Description
This unit describes the skills and knowledge required to set up a machine to cut and add patches during the manufacture of envelopes.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Calibrate and adjust settings
- 1.1 All details required for the job are checked and confirmed against job specifications
- 1.2 Correct materials are checked and available for the job
- 1.3 Adhesives are selected that are appropriate for the substrate, application process and machine
- 1.4 Work area is made safe and prepared for production according to safety requirements
- 1.5 Window cutting and patch unit settings are set according to job specifications
- 1.6 Measurement settings are checked thoroughly against job specifications before production is commenced
- 1.7 Window position and size are set to meet requirements to ensure the machine runs efficiently and safely
- 1.8 Wastage is monitored, kept to a minimum and correctly disposed of according to enterprise quality standards
- 1.9 Process is monitored to maintain quality and identify opportunities for improvement
2. Confirm quality
- 2.1 A sample is produced and checked for conformance with quality standards, and adjustments made if required
- 2.2 Efficiency, quality and output rate of production run are monitored for problems, and any deficiencies resolved
- 2.3 Any machine faults are reported to appropriate responsible person
- 2.4 Locations of all emergency shutdown buttons and triggers are known
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D3069 | ICPCF393C | Set up machine for envelope manufacture | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZL5 | ICP31315 | Certificate III in Print Manufacturing | Qualification |
| AWA7 | ICP40115 | Certificate IV in Printing and Graphic Arts | Qualification |
| AWF4 | ICP40515 | Certificate IV in Printing and Graphic Arts (Mail House) | Qualification |
| AVY0 | ICP30715 | Certificate III in Printing and Graphic Arts (Print Finishing) | Qualification |