Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install pre-cast gully pits

Install pre-cast gully pits

Unit of competency
National Code
RIICPL304D
State Code
WH105
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
040327 - Plumbing
Original Release Date
27/05/2014
Nominal Hours
36
Description
This unit describes a participant’s skills and knowledge required to install pre-cast gully pits in Civil Construction. This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for installing pre-cast gully pits
  • 1.1 Access, interpret and apply pre-cast gully pits documentation and ensure the work activity is compliant
  • 1.2 Obtain, interpret, clarify and confirm work/plans/specifications requirements
  • 1.3 Identify, obtain and implement traffic signage requirements
  • 1.4 Select, and check for faults, equipment/tools for work activities
  • 1.5 Identify, confirm and apply environmental protection requirements
  • 1.6 Select and wear correct personal protective equipment appropriate for work activities
  • 1.7 Identify, address and report potential hazards and risks
  • 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Install gully pits
  • 2.1 Advise plant operator of excavation and base preparation requirements
  • 2.2 Determine location and positioning of gully pits
  • 2.3 Set out work area safely to design specifications
  • 2.4 Control ingress of water by dewatering
  • 2.5 Position, fabricate or install main components of the pre-cast unit
  • 2.6 Seal finished surface by rendering where specified
  • 2.7 Position and attach auxiliary components or modifications to pre-cast unit
  • 2.8 Inspect and repair new and existing gully pits
3. Clean up
  • 3.1 Clear work area and dispose of or recycle materials
  • 3.2 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaces
State Code National Code Title Type
WB536 RIICPL304A Install pre-cast gully pits Unit of competency
Replaced By
State Code National Code Title Type
ODK06 RIICPL304E Install pre-cast gully pits Unit of competency