Unit of competency Outline

Date retreived
22/07/2026 3:43 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install pre-cast gully pits

Install pre-cast gully pits

Unit of competency
National Code
RIICPL304E
State Code
ODK06
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
25/01/2021
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
040327 - Plumbing
Original Release Date
18/06/2021
Nominal Hours
36
Description
This unit describes the skills and knowledge required to install pre-cast gully pits in civil construction. This includes determining location and positioning of gully pits, installing the main components of the pre-cast unit, sealing finished surface by rendering and attaching auxiliary components or modifications to the pre-cast unit. It applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures. Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to install pre-cast gully pits
  • 1.1 Obtain, interpret, clarify and confirm work plans and specifications requirements
  • 1.2 Access, interpret and apply documentation required to install pre-cast gully pits and confirm work activity is compliant
  • 1.3 Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
  • 1.4 Select equipment and tools required for work activities and check for faults
  • 1.5 Select and wear personal protective equipment according to site requirements
  • 1.6 Identify and address potential risks, hazards and environmental issues, and implement control measures within scope of own role
  • 1.7 Obtain and interpret emergency procedures and identify steps required to respond to emergencies
2. Install gully pits
  • 2.1 Advise plant operator of excavation and base preparation requirements
  • 2.2 Determine location and positioning of gully pits according to job requirements
  • 2.3 Set out work area to design specifications
  • 2.4 Control ingress of water by dewatering
  • 2.5 Position, fabricate and install main components of pre-cast unit according to job requirements
  • 2.6 Seal finished surface by rendering where specified
  • 2.7 Position and attach auxiliary components or modifications to pre-cast unit
  • 2.8 Inspect and repair new and existing gully pits according to job requirements
3. Conduct clean-up activities
  • 3.1 Clear work area and dispose of or recycle materials according to site requirements
  • 3.2 Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements
No information
No information
Replaces
State Code National Code Title Type
WH105 RIICPL304D Install pre-cast gully pits Unit of competency
State Code National Code Title Type
BGL0 RII30920 Certificate III in Civil Construction Qualification
BIH1 NWP30222 Certificate III in Water Industry Operations Qualification