Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct prototypes and samples
Construct prototypes and samples
Unit of competency
National Code
LMFFT4006B
LMFFT4006B
State Code
W8643
W8643
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/08/2013
Field of Education
030113 - Cabinet Making
Original Release Date
27/08/2013
Nominal Hours
160
Description
This unit covers the construction of prototypes and samples in accordance with established plans, drawings or specifications.
Notes
Elements and Performance Criteria
1. Establish the work requirements
- 1.1. Purpose of the prototype or sample is identified from plans and drawings
- 1.2. Materials specifications for the item are identified from workplace documentation
- 1.3. Ergonomic requirements are identified, clarified and satisfied throughout the work process
- 1.4. Construction requirements and methods are identified appropriate for the materials used
2. Plan prototype or sample construction
- 2.1. Work plan for the item construction is drafted
- 2.2. OHS requirements, including personal protection needs, are observed throughout the work
- 2.3. Compatibility of materials in specifications is checked and any discrepancies reported
- 2.4. Steps or stages in construction are identified, noting checkpoints for measurements and tests
- 2.5. Suitable work area is located and cleared ready for work
3. Obtain materials and equipment
- 3.1. Materials are selected according to specifications and assembled ready for use
- 3.2. Compatibility of materials with specifications is checked and any discrepancies reported
- 3.3. Equipment and accessories suitable for working the specified material are assembled
- 3.4. Appropriate jigs and other construction aids are identified and where required adjusted to suit the work
4. Construct the prototype or sample
- 4.1. Work plan is followed to construct the item
- 4.2. Checks are conducted at the identified points
- 4.3. Modifications to designs and plans are identified and recommended within workplace procedures
- 4.4. Modifications to the plan are documented and followed
- 4.5. Prototype or sample is checked for fitness for purpose
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Unit scope
This unit covers the work involved in constructing prototypes and samples of products from plans and drawings
Prototypes and samples may be produced by hand, by using appropriate machines, tools and equipment or by computer assisted production and will reflect the finished products produced by the enterprise
The unit requires the use of hand and power tools, basic static and specialised machines, and the application of joinery, construction and finishing techniques
Unit context
OHS requirements include legislation, building codes, material safety management systems, hazardous substances and dangerous goods codes and safe operating procedures
Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, authorised handling procedures and organisation insurance requirements
Work requires individuals to demonstrate analytical and organisational ability, discretion, judgement and problem solving skills
Workplace environment
The construction of prototypes and samples is undertaken in accordance with established enterprise procedures and practices
Work is generally performed with little external assistance and with minimal supervision or direction
Customers may be internal or external
Machines/equipment may include:
any machine typically used in the furnishing sector concerned
microprocessor or computer-controlled machines
both production and facility equipment used in the enterprise
Materials
Materials to be used to construct prototypes and samples will represent those normally used by the enterprise in its production processes. They may include but are not limited to:
timber
metal alloys
glass
fabrics and textiles
plastics
leather
adhesives
fillers and finishes as appropriate
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices
Information and procedures
Work procedures/instructions
Designer/drawer specifications and instructions
Organisation work specifications and requirements
Legislation/regulations/national or industry codes and practices relevant to the prototype/sample construction
Quality and Australian standards and procedures
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Unit scope
This unit covers the work involved in constructing prototypes and samples of products from plans and drawings
Prototypes and samples may be produced by hand, by using appropriate machines, tools and equipment or by computer assisted production and will reflect the finished products produced by the enterprise
The unit requires the use of hand and power tools, basic static and specialised machines, and the application of joinery, construction and finishing techniques
Unit context
OHS requirements include legislation, building codes, material safety management systems, hazardous substances and dangerous goods codes and safe operating procedures
Work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, authorised handling procedures and organisation insurance requirements
Work requires individuals to demonstrate analytical and organisational ability, discretion, judgement and problem solving skills
Workplace environment
The construction of prototypes and samples is undertaken in accordance with established enterprise procedures and practices
Work is generally performed with little external assistance and with minimal supervision or direction
Customers may be internal or external
Machines/equipment may include:
any machine typically used in the furnishing sector concerned
microprocessor or computer-controlled machines
both production and facility equipment used in the enterprise
Materials
Materials to be used to construct prototypes and samples will represent those normally used by the enterprise in its production processes. They may include but are not limited to:
timber
metal alloys
glass
fabrics and textiles
plastics
leather
adhesives
fillers and finishes as appropriate
Personal protective equipment
Personal protective equipment is to include that prescribed under legislation, regulations and enterprise policies and practices
Information and procedures
Work procedures/instructions
Designer/drawer specifications and instructions
Organisation work specifications and requirements
Legislation/regulations/national or industry codes and practices relevant to the prototype/sample construction
Quality and Australian standards and procedures
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects of evidence
Interpret work order, plans and specifications and locate and apply relevant information
Apply safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
Construct a minimum of two different prototypes/samples and:
identify compatibility/incompatibility of materials, adhesives, fittings, fasteners, for the application
select and apply appropriate joinery, construction and finishing techniques
select and use appropriate materials, equipment and processes for the item being constructed
demonstrate how the design of the prototype components will influence the working lifetime of the item
ensure that the prototype satisfies the original or varied specification
Modify activities to cater for variations in workplace contexts and environment
Work effectively with others
Resource implications
Materials, work order, specifications, plans, tools, equipment and consumables.
Method of assessment
Assessment methods must confirm consistency of performance over time and in a range of workplace relevant contexts.
Assessment should be by direct observation of tasks and/or samples of work and questioning on underpinning knowledge.
Assessment should be conducted over time and will generally be in conjunction with assessment of other units of competency.
Context of assessment
Assessment may occur on the job or in a simulated workplace facility with relevant process equipment, simulated work instructions and deadlines.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects of evidence
Interpret work order, plans and specifications and locate and apply relevant information
Apply safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
Construct a minimum of two different prototypes/samples and:
identify compatibility/incompatibility of materials, adhesives, fittings, fasteners, for the application
select and apply appropriate joinery, construction and finishing techniques
select and use appropriate materials, equipment and processes for the item being constructed
demonstrate how the design of the prototype components will influence the working lifetime of the item
ensure that the prototype satisfies the original or varied specification
Modify activities to cater for variations in workplace contexts and environment
Work effectively with others
Resource implications
Materials, work order, specifications, plans, tools, equipment and consumables.
Method of assessment
Assessment methods must confirm consistency of performance over time and in a range of workplace relevant contexts.
Assessment should be by direct observation of tasks and/or samples of work and questioning on underpinning knowledge.
Assessment should be conducted over time and will generally be in conjunction with assessment of other units of competency.
Context of assessment
Assessment may occur on the job or in a simulated workplace facility with relevant process equipment, simulated work instructions and deadlines.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WI455 | MSFFT4006 | Construct prototypes and samples | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| 3172 | 10220NAT | Diploma of Industrial Design | Accredited course |