Unit of competency Outline
Date retreived
22/07/2026 1:07 AM AWST
22/07/2026 1:07 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct pre-installation audit for software installation.doc
Conduct pre-installation audit for software installation.doc
Unit of competency
National Code
ICAI5090B
ICAI5090B
State Code
D0118
D0118
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
29/11/2007
Field of Education
020305 - Systems Analysis And Design
Original Release Date
29/11/2007
Nominal Hours
25
Description
This unit defines the competency required to identify and appraise critical pre-existing systems or components prior to the installation of software. Establishing compatibility and interoperability is a key success factor which would be useful undertakings to the purchase of software.The following units are linked and form an appropriate cluster:ICAS5104B Determine maintenance strategyICAS5105B Coordinate change requestsICAS5111B Review and manage delivery of maintenance servicesICAT5081B Perform systems test
Notes
Elements and Performance Criteria
1. Assess compatibility of existing software
- 1.1. Confirm details of software loaded on client system from actual system and from existing system documentation
- 1.2. Identify software prerequisites needed for new software
- 1.3. Confirm minimum customer requirements with technical specifications
- 1.4. Confirm and assess compatibility issues against installation plan and cost constraints
- 1.5. Document recommendations on variances, level and software consistency for consideration by appropriateperson
2. Confirm interoperability of software with environment
- 2.1. Confirm that there are no conflicts between the new software and previously installed software and hardware
- 2.2. Measure the degree of interoperability between software
- 2.3. Confirm the interoperable functioning of all software involved
3. Assess system capacity to install ordered software
- 3.1. Obtain details of current system memory, disk, available disk storage, other specific hardware requirements from investigation of actual system and existing system documentation
- 3.2. Confirm that the hardware prerequisites needed for new software are met, implications noted and minimum requirements identified
- 3.3. Confirm and assess capacity issues against installation plan and cost constraints
- 3.4. Document recommendations on variances in capacity for consideration by appropriate person
4. Prepare and distribute audit report
- 4.1. Document findings, recommendations and impact on project in a manner appropriate for target audience
- 4.2. Present and distribute the audit analysis report according to organisational standards and procedures
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
workstations
personal computers
modems and other connectivity devices
networks
DSL modems
remote sites
servers
a department within the organisation
a third party, so the relationship and ease of access will vary
supervisor
teacher
authorised business representative
client
time
budget
resource
hardware
software
policy
legal constraints
commercial software applications; organisation-specific software, packaged software, in-house or customised software
workstations
personal computers
modems and other connectivity devices
networks
DSL modems
remote sites
servers
a department within the organisation
a third party, so the relationship and ease of access will vary
supervisor
teacher
authorised business representative
client
time
budget
resource
hardware
software
policy
legal constraints
commercial software applications; organisation-specific software, packaged software, in-house or customised software
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the following is essential:
Assessment must confirm sufficient ability to guide clients about which specific components are required prior to commencement of installation. Clear recommendations and assignment of responsibility for missing components must be evident. Additionally, the person must be able to determine the impact and risks associated with either continuing or discontinuing implementation.
To demonstrate competency in this unit the person will require access to:
Operational system and system specifications
Technical specifications of software to be installed
Documentation tools
Context of and specific resources for assessment
Pre-installation planning and audit stages are important to the success of software installation and upgrade projects. Data collected and analyses undertaken through these processes inform the implementation plan by clearly establishing environmental and technical prerequisites and may assist in avoiding costly mistakes in software choice and lost revenue or productivity.
The breadth, depth and complexity covering planning and initiation of alternative approaches to skills or knowledge applications across a broad range of technical and/or management requirements, evaluation and coordination would be characteristic.
Assessment must ensure:
The demonstration of competency may also require self-directed application of knowledge and skills, with substantial depth in some areas where judgement is required in planning and selecting appropriate equipment, services and techniques for self and others.
Applications involve participation in development of strategic initiatives as well as personal responsibility and autonomy in performing complex technical operations or organising others. It may include participation in teams including teams concerned with planning and evaluation functions. Group or team coordination may also be involved.
Method of assessment
The purpose of this unit is to define the standard of performance to be achieved in the workplace. In undertaking training and assessment activities related to this unit, consideration should be given to the implementation of appropriate diversity and accessibility practices in order to accommodate people who may have special needs. Additional guidance on these and related matters is provided in ICA05 Section 1.
Competency in this unit should be assessed using summative assessment to ensure consistency of performance in a range of contexts. This unit can be assessed either in the workplace or in a simulated environment. However, simulated activities must closely reflect the workplace to enable full demonstration of competency.
Assessment will usually include observation of real or simulated work processes and procedures and/or performance in a project context as well as questioning on underpinning knowledge and skills. The questioning of team members, supervisors, subordinates, peers and clients where appropriate may provide valuable input to the assessment process. The interdependence of units for assessment purposes may vary with the particular project or scenario.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICAS5104B Determine maintenance strategy
ICAS5105B Coordinate change requests
ICAS5111B Review and manage delivery of maintenance services
ICAT5081B Perform systems test
An individual demonstrating this competency would be able to:
Demonstrate understanding of a broad knowledge base incorporating theoretical concepts, with substantial depth in some areas
Analyse and plan approaches to technical problems or management requirements
Transfer and apply theoretical concepts and/or technical or creative skills to a range of situations
Evaluate information, using it to forecast for planning or research purposes
Take responsibility for own outputs in relation to broad quantity and quality parameters
Take some responsibility for the achievement of group outcomes
Maintain knowledge of industry products and services
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the following is essential:
Assessment must confirm sufficient ability to guide clients about which specific components are required prior to commencement of installation. Clear recommendations and assignment of responsibility for missing components must be evident. Additionally, the person must be able to determine the impact and risks associated with either continuing or discontinuing implementation.
To demonstrate competency in this unit the person will require access to:
Operational system and system specifications
Technical specifications of software to be installed
Documentation tools
Context of and specific resources for assessment
Pre-installation planning and audit stages are important to the success of software installation and upgrade projects. Data collected and analyses undertaken through these processes inform the implementation plan by clearly establishing environmental and technical prerequisites and may assist in avoiding costly mistakes in software choice and lost revenue or productivity.
The breadth, depth and complexity covering planning and initiation of alternative approaches to skills or knowledge applications across a broad range of technical and/or management requirements, evaluation and coordination would be characteristic.
Assessment must ensure:
The demonstration of competency may also require self-directed application of knowledge and skills, with substantial depth in some areas where judgement is required in planning and selecting appropriate equipment, services and techniques for self and others.
Applications involve participation in development of strategic initiatives as well as personal responsibility and autonomy in performing complex technical operations or organising others. It may include participation in teams including teams concerned with planning and evaluation functions. Group or team coordination may also be involved.
Method of assessment
The purpose of this unit is to define the standard of performance to be achieved in the workplace. In undertaking training and assessment activities related to this unit, consideration should be given to the implementation of appropriate diversity and accessibility practices in order to accommodate people who may have special needs. Additional guidance on these and related matters is provided in ICA05 Section 1.
Competency in this unit should be assessed using summative assessment to ensure consistency of performance in a range of contexts. This unit can be assessed either in the workplace or in a simulated environment. However, simulated activities must closely reflect the workplace to enable full demonstration of competency.
Assessment will usually include observation of real or simulated work processes and procedures and/or performance in a project context as well as questioning on underpinning knowledge and skills. The questioning of team members, supervisors, subordinates, peers and clients where appropriate may provide valuable input to the assessment process. The interdependence of units for assessment purposes may vary with the particular project or scenario.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICAS5104B Determine maintenance strategy
ICAS5105B Coordinate change requests
ICAS5111B Review and manage delivery of maintenance services
ICAT5081B Perform systems test
An individual demonstrating this competency would be able to:
Demonstrate understanding of a broad knowledge base incorporating theoretical concepts, with substantial depth in some areas
Analyse and plan approaches to technical problems or management requirements
Transfer and apply theoretical concepts and/or technical or creative skills to a range of situations
Evaluate information, using it to forecast for planning or research purposes
Take responsibility for own outputs in relation to broad quantity and quality parameters
Take some responsibility for the achievement of group outcomes
Maintain knowledge of industry products and services
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| C8758 | ICAI5090A | Conduct pre installation audit for software installation | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| D8069 | ICASAS407A | Conduct pre-installation audit for software installation | Unit of competency |