Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop a Just in Time system
Develop a Just in Time system
Unit of competency
National Code
MSS405021A
MSS405021A
State Code
WD558
WD558
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
24/10/2014
Field of Education
030101 - Manufacturing Engineering
Original Release Date
24/10/2014
Nominal Hours
60
Description
Not applicable.
Notes
Elements and Performance Criteria
1 Design the JIT system/system improvements
- 1.1 Identify value chain members
- 1.2 Consult with internal and external value chain members
- 1.3 Identify current storage/inventory in value chain
- 1.4 Determine flow authorisation indicators
- 1.5 Determine minimum and maximum operations rate
- 1.6 Determine lead time for product or service
- 1.7 Determine number of units per kanban
- 1.8 Draft workable procedures to implement JIT
2 Implement the JIT system/improvements
- 2.1 Consult with key internal stakeholders to develop solutions to JIT issues
- 2.2 Ensure all stakeholders have required JIT-related skills and related issues have been resolved
- 2.3 Liaise with key external members of the value chain to develop solutions to JIT issues
- 2.4 Develop implementation plan for JIT
- 2.5 Determine key measures of JIT
3 Monitor the JIT system
- 3.1 Monitor key measures of JIT
- 3.2 Regularly liaise with key stakeholders seeking areas for improvement
- 3.3 Identify areas in need of improvement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
JIT, kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
JIT
JIT is a production scheduling concept that calls for any item or service needed at a production operation, whether raw material, components, fuel, power, finished item, or anything else in between raw material and delivery to the final customer, to be produced and available precisely when needed, neither a moment earlier nor a moment later. JIT principles may also be applied to non-product based manufacturing operations (e.g. where services must be delivered on demand, such as transport)
Kanban
Kanban is a signal to authorise production or movement of an item to the next stage of production or operations. It is often a physical item for example a card, bin or sheet. When fully implemented, kanban operates according to the following rules:
all production and movement of parts, material or other necessary items takes place only as required by a downstream operation
the specific tool which authorises production or movement is called a kanban
Kanban is typically applied to batch type operations and the production is measured in units produced. In continuous operations organisations, production is measured in terms of production rate (e.g. kg/h, tonne/day) and rate is increased/decreased according to the flow authorisation which may be a kanban (e.g. ticket or order from a supplier) or may be a SCADA signal from a remote facility (e.g. customer tank) saying that resupply is required or similar.
In service operations a physical kanban may not be used - see flow authorisation indicator
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/ collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
Flow authorisation indicator
Flow authorisation indicator may include:
kanban bin, ticket or similar
other indicator of demand pull
Pull system
Pull system includes:
an operations planning system which makes to demand, rather than for stock or to a forecast
Cards/bins
Cards/bins include:
the indicators used for production authorisation and may be physical cards or bins or some other suitable indicator
Procedures
Procedures may include:
work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions and similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. good manufacturing practice (GMP) and responsible care)
government regulations
Procedures may be:
written, verbal, computer-based or in some other format
Key measures
Key measures may include:
inventory levels
lead time
in full, on time and in specification (IFOTIS) delivery
productivity/production rate
other measures of pull through the value chain
quality
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
JIT, kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
JIT
JIT is a production scheduling concept that calls for any item or service needed at a production operation, whether raw material, components, fuel, power, finished item, or anything else in between raw material and delivery to the final customer, to be produced and available precisely when needed, neither a moment earlier nor a moment later. JIT principles may also be applied to non-product based manufacturing operations (e.g. where services must be delivered on demand, such as transport)
Kanban
Kanban is a signal to authorise production or movement of an item to the next stage of production or operations. It is often a physical item for example a card, bin or sheet. When fully implemented, kanban operates according to the following rules:
all production and movement of parts, material or other necessary items takes place only as required by a downstream operation
the specific tool which authorises production or movement is called a kanban
Kanban is typically applied to batch type operations and the production is measured in units produced. In continuous operations organisations, production is measured in terms of production rate (e.g. kg/h, tonne/day) and rate is increased/decreased according to the flow authorisation which may be a kanban (e.g. ticket or order from a supplier) or may be a SCADA signal from a remote facility (e.g. customer tank) saying that resupply is required or similar.
In service operations a physical kanban may not be used - see flow authorisation indicator
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/ collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
Flow authorisation indicator
Flow authorisation indicator may include:
kanban bin, ticket or similar
other indicator of demand pull
Pull system
Pull system includes:
an operations planning system which makes to demand, rather than for stock or to a forecast
Cards/bins
Cards/bins include:
the indicators used for production authorisation and may be physical cards or bins or some other suitable indicator
Procedures
Procedures may include:
work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions and similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. good manufacturing practice (GMP) and responsible care)
government regulations
Procedures may be:
written, verbal, computer-based or in some other format
Key measures
Key measures may include:
inventory levels
lead time
in full, on time and in specification (IFOTIS) delivery
productivity/production rate
other measures of pull through the value chain
quality
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of their ability to:
develop a complete JIT system, including:
implementation strategy
key measures
training and support strategy for employees and value chain members
procedures in the event of a non-conformance
communicate and negotiate complex issues to a wide variety of individuals
supervise JIT implementation and suggest improvements.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
This unit may be assessed concurrently with:
MSS405002A Analyse and map a value stream, and/or
MSS405050A Determine and improve process capability.
This unit is related to:
MSS402021A Apply Just in Time procedures
MSS403021A Facilitate a Just in Time system
which cover the lowest and intermediate skill levels in competitive systems and practices respectively.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of their ability to:
develop a complete JIT system, including:
implementation strategy
key measures
training and support strategy for employees and value chain members
procedures in the event of a non-conformance
communicate and negotiate complex issues to a wide variety of individuals
supervise JIT implementation and suggest improvements.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
This unit may be assessed concurrently with:
MSS405002A Analyse and map a value stream, and/or
MSS405050A Determine and improve process capability.
This unit is related to:
MSS402021A Apply Just in Time procedures
MSS403021A Facilitate a Just in Time system
which cover the lowest and intermediate skill levels in competitive systems and practices respectively.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9014 | MSACMT621A | Develop a Just in Time (JIT) system | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAJ93 | MSS405021 | Develop a Just in Time system | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J130 | MSS40312 | Certificate IV in Competitive Systems and Practices | Qualification |
| J132 | MSS50312 | Diploma of Competitive Systems and Practices | Qualification |
| J133 | MSS60312 | Advanced Diploma of Competitive Systems and Practices | Qualification |
| J368 | MEM60112 | Advanced Diploma of Engineering | Qualification |
| J367 | MEM50212 | Diploma of Engineering - Technical | Qualification |
| AWX6 | DEF52215 | Diploma of Explosive Ordnance Manufacture | Qualification |
| W398 | LMT60507 | Advanced Diploma of Fashion and Textiles Merchandising | Qualification |
| W528 | MSA60108 | Advanced Diploma of Manufacturing Technology | Qualification |
| W526 | MSA50108 | Diploma of Manufacturing Technology | Qualification |
| W402 | PMB50107 | Diploma of Polymer Technology | Qualification |
| W403 | PMB60107 | Advanced Diploma of Polymer Technology | Qualification |
| AWC6 | ICP50115 | Diploma of Printing and Graphic Arts | Qualification |
| J131 | MSS50112 | Diploma of Sustainable Operations | Qualification |