Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay reinforced concrete box culverts
Lay reinforced concrete box culverts
Unit of competency
National Code
RIICRC209A
RIICRC209A
State Code
WB435
WB435
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
05/04/2011
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
05/04/2011
Nominal Hours
32
Description
This unit covers the laying of reinforced concrete box culverts in the civil construction industry. It includes planning and preparing, setting out and excavating, constructing concrete bases, laying culvert units, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1. Access, interpret and apply compliance documentation relevant to the work activity
- 1.2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.3. Identify, obtain and implement signage requirements from the project traffic management plan
- 1.4. Select tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.5. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
- 1.6. Check RCBC units to ensure conformity
2. Set out and excavation
- 2.1. Determine location and depths of excavation from job drawings
- 2.2. Set out and clearly mark excavation location
- 2.3. Advise plant operator of excavation requirements
- 2.4. Check excavation depths and grades to conform with plans and specifications
- 2.5. Compact and prepare foundations base for testing
3. Construct concrete base
- 3.1. Set out and construct formwork to required dimensions
- 3.2. Place steel reinforcement to specifications
- 3.3. Form recesses in slab as specified
- 3.4. Connect and tighten hold down anchors to specified requirements
- 3.5. Place, compact, finish and cure concrete to specified requirements
4. Lay culvert units
- 4.1. Place continuous mortar bed to support legs
- 4.2. Lower and position RCBC units to line and level on supporting slab
- 4.3. Connect hold down anchors to RCBC units
- 4.4. Finish joints between RCBC units to specification
- 4.5. Infill space between legs of multiple culverts to specification
- 4.6. Install spanning slabs where specified for multiple culverts
- 4.7. Cut off and treat lifting lugs
- 4.8. Finish inlet and outlet of culvert
- 4.9. Advise plant operator of compaction and backfill requirements and backfill culvert to required finish level
5. Clean up
- 5.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
- 5.2. Clean, check, maintain and store tools and equipment
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with underground and overhead services, other machines, personnel, restricted access barriers, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distances from excavations are kept, and areas secured from unauthorised access or movement
hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures including emergency shutdown and stopping, organisational First Aid requirements and evacuation
Site may include:
any ground conditions in urban and rural areas
Signage may include:
escort vehicle signage
highway traffic signs
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Traffic conditions may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Tools and equipment may include:
levelling equipment
shovels
lifting equipment
crow bars
hammers
grinders
jointing equipment
oxy-acetylene equipment
scaffolding
saws
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
RCBC culverts may include:
those units used in the construction of culverts under roads
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with underground and overhead services, other machines, personnel, restricted access barriers, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distances from excavations are kept, and areas secured from unauthorised access or movement
hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures including emergency shutdown and stopping, organisational First Aid requirements and evacuation
Site may include:
any ground conditions in urban and rural areas
Signage may include:
escort vehicle signage
highway traffic signs
site safety signage
temporary signage for the benefit of motorists and pedestrians
barricades
traffic conditions signage
Traffic conditions may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Tools and equipment may include:
levelling equipment
shovels
lifting equipment
crow bars
hammers
grinders
jointing equipment
oxy-acetylene equipment
scaffolding
saws
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
RCBC culverts may include:
those units used in the construction of culverts under roads
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for laying reinforced concrete box culverts
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of reinforced concrete box culvert laying
working with others to undertake and complete the laying of reinforced concrete box culverts that meets all of the required outcomes
consistent timely completion of reinforced concrete box culvert laying that safely, effectively and efficiently meets the required outcomes
installation of thirty RCBC culvert units to design specifications
construction of a minimum of two RCBC support slabs
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the laying of reinforced concrete box culverts
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for laying reinforced concrete box culverts
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of reinforced concrete box culvert laying
working with others to undertake and complete the laying of reinforced concrete box culverts that meets all of the required outcomes
consistent timely completion of reinforced concrete box culvert laying that safely, effectively and efficiently meets the required outcomes
installation of thirty RCBC culvert units to design specifications
construction of a minimum of two RCBC support slabs
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the laying of reinforced concrete box culverts
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2106 | BCCRC2009B | Lay reinforced concrete box culverts | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH116 | RIICRC209D | Lay reinforced concrete box culverts | Unit of competency |