Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay reinforced concrete box culverts
Lay reinforced concrete box culverts
Unit of competency
National Code
RIICRC209D
RIICRC209D
State Code
WH116
WH116
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
040327 - Plumbing
Original Release Date
27/05/2014
Nominal Hours
32
Description
This unit describes a participant’s skills and knowledge required to lay reinforced concrete box culverts in Civil Construction.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to lay reinforced concrete box culverts
- 1.1 Access, interpret and apply reinforced concrete box culverts laying documentation and ensure the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
- 1.4 Select and wear correct personal protective equipment appropriate for work activities
- 1.5 Identify, obtain, confirm and implement signage requirements
- 1.6 Select and check for faults all plant, tools and equipment to carry out tasks
- 1.7 Check box culverts (RCBC) units to ensure conformity to relevant drawing and job specifications
- 1.8 Confirm plant and/or crane requirements to assist in preparing ground and placing box culverts
2. Set out and excavation
- 2.1 Determine location and depths of excavation from job drawings
- 2.2 Set out and clearly mark excavation location
- 2.3 Advise plant operator of excavation requirements
- 2.4 Check excavation depths and grades to conform with plans and specifications
- 2.5 Compact and prepare foundations base for testing
3. Construct concrete base
- 3.1 Set out and construct formwork to required dimensions
- 3.2 Place steel reinforcement to specifications
- 3.3 Form recesses in slab as specified
- 3.4 Connect and tighten hold down anchors to specified requirements
- 3.5 Place, compact, finish and cure concrete to specified requirements
4. Lay culvert units
- 4.1 Place continuous mortar bed to support legs
- 4.2 Lower and position RCBC units to line and level on supporting slab
- 4.3 Connect hold down anchors to RCBC units
- 4.4 Finish joints between RCBC units to specification
- 4.5 Infill space between legs of multiple culverts to specification
- 4.6 Install spanning slabs where specified for multiple culverts
- 4.7 Cut off and treat lifting lugs
- 4.8 Finish inlet and outlet of culvert
- 4.9 Advise plant operator of compaction and backfill requirements and backfill culvert to required finish level
5. Clean up
- 5.1 Clear work area and dispose of or recycle materials
- 5.2 Clean, check, maintain and store tools and equipment
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB435 | RIICRC209A | Lay reinforced concrete box culverts | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCX64 | RIICRC209E | Lay reinforced concrete box culverts | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFA8 | RII30919 | Certificate III in Civil Construction | Qualification |
| AZB0 | RII30915 | Certificate III in Civil Construction | Qualification |