Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Shut down a hydro turbine
Shut down a hydro turbine
Unit of competency
National Code
UEPOPS136
UEPOPS136
State Code
ODY06
ODY06
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
14/04/2023
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/04/2023
Nominal Hours
54
Description
This unit involves the skills and knowledge required to conduct a shutdown of a hydro turbine to where it can be placed at rest safely.Shutdown of a hydro turbine will involve the operator making a sequence of checks prior to and during shutdown. This ensures that the shutdown of the turbine is completed in a safe and consistent manner.Competency in this unit requires the ability plan and prepare hydro turbine shutdown, conduct a shutdown, test hydro turbine plant operation during shutdown, analyse hydro turbine system faults during shutdown and complete documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and preparework
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
- 1.2 Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
- 1.3 Hydro turbine running-up and loading schedule are ascertained from documentation in accordance with workplace procedures
2 Conduct hydro turbineshutdown
- 2.1 Hydro turbine load is reduced in accordance with manufacturers' recommendations and specifications, and workplace procedures
- 2.2 Hydro turbine and alternator are removed from the system in accordance with manufacturers' recommendations and specifications, and workplace procedures
3 Test and analyse hydro turbineplant operationduring shutdown
- 3.1 Tests are performed in accordance with workplace procedures
- 3.2 Power generation system and hydro turbine plant are observed for correct operational response in accordance with workplace procedures
- 3.3 Causes of abnormal hydro turbine plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures
4 Complete documentation
- 4.1 Hydro turbine plant problems, movements and status are reported in accordance with workplace procedures
- 4.2 Documentation is updated in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAG26 | UEPOPS445 | Shut down a hydro turbine | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHQ2 | UEP40122 | Certificate IV in ESI Generation | Qualification |
| BHP9 | UEP50122 | Diploma of ESI Generation | Qualification |