Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare multi-place hyperbaric chamber

Prepare multi-place hyperbaric chamber

Unit of competency
National Code
HLTHY401C
State Code
D8300
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/03/2011
State Implementation and Classification
Approved Date
22/07/2011
Field of Education
030717 - Plant And Machine Operations
Original Release Date
22/07/2011
Nominal Hours
90
Description
DescriptorThis unit of competency describes the skills and knowledge required to prepare a multi-place hyperbaric chamber for safe operation
Notes
Elements and Performance Criteria
1. Prepare chamber for compression
  • 1.1 Complete pre-compression checklist in accordance with organisation policies and procedures
  • 1.2 Check that the chamber compartment is clean and free from flammable items
  • 1.3 Check that the chamber components are in working order/serviceable
  • 1.4 Check that the chamber valve alignment is correct
  • 1.5 Ensure waste disposal system is in working order
  • 1.6 Complete user maintenance in accordance with organisation policies and procedures and maintenance schedule
2. Establish power supply to panel and chamber
  • 2.1 Ensure lighting to chamber is in working order
  • 2.2 Ensure gas analysers are operating
  • 2.3 Check that auxiliary power supply is available
  • 2.4 Ensure alarm indicators are switched on and in working order
  • 2.5 Ensure closed circuit TV systems are switched on and in working order
  • 2.6 Ensure communications systems are functioning correctly
3. Establish gas supply to chamber
  • 3.1 Check that primary treatment gas is available
  • 3.2 Ensure sufficient gas is available to complete treatment
  • 3.3 Ensure treatment gas is supplied to chamber
  • 3.4 Check to ensure secondary gas supplies are on-line
  • 3.5 Ensure air compressors are operational
4. Select equipment and materials for compression
  • 4.1 Ensure that equipment and materials selected are correct, cleaned and prepared
  • 4.2 Check that equipment and materials selected are in working order
  • 4.3 Identify and label faulty equipment
  • 4.4 Complete documentation in accordance with organisation policies and procedures
  • 4.5 Complete equipment repair in accordance with organisation policies and procedures and manufacturer's instructions
5. Prepare chamber occupants for compression
  • 5.1 Discuss treatment plan with attendance prior to the procedure
  • 5.2 Check that the attendant's qualifications and fitness to dive
  • 5.3 Ensure chamber occupants are wearing non-flammable clothing/items
No information
No information
Replaces
State Code National Code Title Type
C9306 HLTHY401B Prepare multi-place hyperbaric chamber Unit of competency
Replaced By
State Code National Code Title Type
WD174 HLTHY401D Prepare multi-place hyperbaric chamber Unit of competency
State Code National Code Title Type
D063 HLT41507 Certificate IV in Hyperbaric Technology Qualification