Unit of competency Outline
Date retreived
22/07/2026 8:02 PM AWST
22/07/2026 8:02 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design control measures and structures
Design control measures and structures
Unit of competency
National Code
AHCSAW501
AHCSAW501
State Code
BAQ66
BAQ66
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/01/2017
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
12/01/2017
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to design erosion and sediment control measures and structures.This unit applies to individuals who take personal responsibility and exercise autonomy in undertaking complex work. This includes analysing, designing and communicating solutions to sometimes complex problems.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Identify measures or structures to be designed
- 1.1 Review the erosion and sediment control plan for technical accuracy and environmental impacts
- 1.2 Confirm adherence to regulations and legislation and note on works plans
- 1.3 Confirm budget constraints for project with management or client
- 1.4 Apply design criteria in line with industry standards
2. Apply design procedures
- 2.1 Calculate catchment characteristics to required accuracy
- 2.2 Determine design specifications
- 2.3 Develop draft design for structure that meets budget constraints
- 2.4 Modify structure design in response to application of design procedures and accepted industry practices
- 2.5 Ensure design applies environmentally sustainable practices
3. Prepare specification schedule
- 3.1 Confirm that provided documentation aligns with the plan and follows industry standards
- 3.2 Confirm suitability of design specifications to comply with the category of work and legislative requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7239 | AHCSAW501A | Design control measures and structures | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCT20 | AHCSAW504 | Design control measures and structures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BDA6 | AHC51116 | Diploma of Conservation and Land Management | Qualification |