Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Use planning software systems in manufacturing

Use planning software systems in manufacturing

Unit of competency
National Code
MSACMT260A
State Code
W8992
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/12/2005
State Implementation and Classification
Approved Date
14/11/2011
Field of Education
030101 - Manufacturing Engineering
Original Release Date
14/11/2011
Nominal Hours
30
Description
This unit covers the knowledge and skills needed to access planning software (often known as ERP, MRP, MRPII, and often by its brand name, such as SAP) to make routine business decisions required of the person as a regular part of their job.
Notes
Elements and Performance Criteria
1. Use interface
  • 1.1. Use keyboards, track ball/mouse and monitor and/or other peripherals to access system
  • 1.2. Navigate through the system and the screens
  • 1.3. Acknowledge messages
  • 1.4. Input and output information in the required format
2. Access information
  • 2.1. Obtain relevant data and information from the system
  • 2.2. Identify the status of items in the value chain
  • 2.3. Access historical data and information
  • 2.4. Interpret information and prioritise actions
3. Take appropriate actions in accordance with procedures
  • 3.1. Take actions in response to information
  • 3.2. Follow up as appropriate to ensure anticipated results have occurred
  • 3.3. Record adjustments and variations according to procedures
  • 3.4. Identify any learning needs to use planning software and seek appropriate support

Planning software is a general term applied to a number of software systems which integrate a range of business information such as finance, logistics maintenance and production. It is frequently referred to by names such as ERP, SAP, MRP/MRPII.


Competitive manufacturing organisations encompass the entire production system, beginning with the customer, and includes the product sales outlet, the final assembler, product design, raw material mining and processing and all tiers of the


Procedures includes all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, verbal, computer based or in some other form.

For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Good Manufacturing Practice (GMP), Responsible Care) and government regulations.

Overview of assessment requirements
The employee will routinely use the relevant parts of the planning software system for their job.

What are the specific resource requirements for this unit?
Access to an organisation using a planning software system.

What critical aspects of evidence are required to demonstrate competency in this unit?
Evidence of routine use of planning software as part of their job is required.

In what context should assessment occur?
Assessment needs to occur in a workplace using a planning software system or a simulation system.

Are there any other units which could or should be assessed with this unit or which relate directly to this unit?
This unit should be assessed concurrently with relevant technical units for the process.
This unit covers the lower skill levels of using planning software.

What method of assessment should apply?
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.
Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.
The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.
The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.

What evidence is required for demonstration of consistent performance?
Evidence of routine use over an extended period should be available. Planning software systems will typically log all interactions with it. Interrogation of the planning software system will therefore provide evidence of the operator's use of it. Actions taken may also be accessible from the planning software system itself, or may need other evidence available from the process.

Replaces
State Code National Code Title Type
W2577 MCMT260A Use planning software systems in manufacturing Unit of competency
Replaced By
State Code National Code Title Type
WD509 MSS402060A Use planning software systems in operations Unit of competency