Unit of competency Outline
Date retreived
22/07/2026 7:12 AM AWST
22/07/2026 7:12 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Use planning software systems in operations
Use planning software systems in operations
Unit of competency
National Code
MSS402060A
MSS402060A
State Code
WD509
WD509
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
24/10/2014
Field of Education
080317 - Quality Management
Original Release Date
24/10/2014
Nominal Hours
30
Description
This unit of competency covers the skills and knowledge required to access planning software (often known as Enterprise resource Planning (ERP), Materials Resource Planning (MRP and MRPII), and often by a proprietary name, to make routine business decisions required of the person as a regular part of their job.
Notes
Elements and Performance Criteria
1 Use interface
- 1.1 Identify terminals relevant to own work station and functions
- 1.2 Use keyboards, track ball/mouse and monitor and/or other peripherals to access system
- 1.3 Navigate through system and screens to find program menu and data relevant to own work
- 1.4 Identify and input information on own work processes at required frequency and to required detail
- 1.5 Access message section and acknowledge messages
- 1.6 Identify problems and make suggestions for improvements to relevance of planning software to own work
2 Access information
- 2.1 Identify work processes that require information from planning software system
- 2.2 Obtain relevant data and information on current operations from the planning software system
- 2.3 Identify the status of items in the value stream
- 2.4 Access historical data and information
- 2.5 Interpret information and identify and prioritise any actions required in response to information
3 Take appropriate actions in accordance with procedures
- 3.1 Take actions in response to information obtained from planning software
- 3.2 Follow up as appropriate to ensure anticipated results have occurred
- 3.3 Record adjustments and variations according to procedures
- 3.4 Identify any learning needs to use planning software and seek appropriate support
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
Planning software
Planning software includes:
software systems which integrate a range of business information, such as finance, logistics maintenance and production (frequently referred to as ERP, MRP, MRPII or a range of proprietary names)
Relevant data and information
Relevant data and information may include:
technical and other drawings
standard operating procedures and other work instructions
production schedules including historical data
orders and order tracking information
stock control
contact lists
occupational health and safety (OHS) information
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement, stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
Items in the value stream
Items in the value stream refer to information held within the planning software system that contributes to creating value as determined by the customer. Depending on the organisation it may include:
physical elements of the production system, such as sites, work stations, equipment, material, including stock, work in progress and finished products
information needed to meet customer requirements, such as designs, drawings, work instructions, standard operating procedures, standards, material lists and pricing
information not directly related to current customer requirements but required by the organisation
Procedures
Procedures may include:
work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions and similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. good manufacturing practice (GMP) and responsible care)
government regulations
Procedures may be:
written, verbal, computer-based or in some other format
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
Planning software
Planning software includes:
software systems which integrate a range of business information, such as finance, logistics maintenance and production (frequently referred to as ERP, MRP, MRPII or a range of proprietary names)
Relevant data and information
Relevant data and information may include:
technical and other drawings
standard operating procedures and other work instructions
production schedules including historical data
orders and order tracking information
stock control
contact lists
occupational health and safety (OHS) information
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement, stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
Items in the value stream
Items in the value stream refer to information held within the planning software system that contributes to creating value as determined by the customer. Depending on the organisation it may include:
physical elements of the production system, such as sites, work stations, equipment, material, including stock, work in progress and finished products
information needed to meet customer requirements, such as designs, drawings, work instructions, standard operating procedures, standards, material lists and pricing
information not directly related to current customer requirements but required by the organisation
Procedures
Procedures may include:
work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions and similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. good manufacturing practice (GMP) and responsible care)
government regulations
Procedures may be:
written, verbal, computer-based or in some other format
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify the scope and relevance of planning software system to their own work
enter and retrieve data, including normal performance and variations
use planning software system to assist in own work
contribute suggestions for improvement to performance and relevance of planning software to own work area.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify the scope and relevance of planning software system to their own work
enter and retrieve data, including normal performance and variations
use planning software system to assist in own work
contribute suggestions for improvement to performance and relevance of planning software to own work area.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8992 | MSACMT260A | Use planning software systems in manufacturing | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAK42 | MSS402060 | Use planning software systems in operations | Unit of competency |