Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Cure concrete
Cure concrete
Unit of competency
National Code
RIICRC318E
RIICRC318E
State Code
OCX75
OCX75
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030901 - Construction Engineering
Original Release Date
18/06/2021
Nominal Hours
16
Description
This unit describes the skills and knowledge required to cure concrete in civil construction, including installing and maintaining runoff devices and isolating work areas.It applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to cure concrete
- 1.1 Obtain, interpret, clarify and confirm work requirements
- 1.2 Access, interpret and apply documentation required to cure concrete and confirm work activity is compliant
- 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
- 1.4 Select and wear personal protective equipment according to site requirements
- 1.5 Identify, obtain, confirm and implement signage and barrier requirements
- 1.6 Select and check for faults to plant, tools and equipment
2. Cure concrete
- 2.1 Cure concrete according to job requirements
- 2.2 Install and maintain run-off devices according to job requirements
- 2.3 Apply and maintain curing compound and curing technique on concrete surface according to job requirements
- 2.4 Isolate and/or barricade work area according to site requirements and confirm concrete protection during curing process
- 2.5 Monitor movements and hazards and identify and communicate changes to work environment according to site requirements
3. Conduct clean-up activities
- 3.1 Clean work area and dispose of, reuse or recycle materials according to site requirements
- 3.2 Clean, check, maintain and store tools and equipment according to manufacturer specifications and site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH134 | RIICRC318D | Cure concrete | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |
| AC190 | RIISS00021 | Concrete Paving - Hand Texturing and Curing Skill Set | Skill set |
| AB799 | RIISS00027 | Concrete Paving - Texture Machine Operator Skill Set | Skill set |