Unit of competency Outline

Date retreived
22/07/2026 7:50 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Carry out pavement condition measurement

Carry out pavement condition measurement

Unit of competency
National Code
RIICRC405A
State Code
WB633
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/06/2011
State Implementation and Classification
Approved Date
23/12/2009
Field of Education
030901 - Construction Engineering
Original Release Date
23/12/2009
Nominal Hours
50
Description
This unit covers the carrying out of pavement condition measurement in Civil Construction. It includes the requirements for planning, preparing, initiating, monitoring, adjusting and reporting of pavement condition measurement.
Notes
Elements and Performance Criteria
1. Plan and prepare for pavement condition measurement
  • 1.1. Access, interpret and apply compliance documentation relevant to the work activity
  • 1.2. Access and share with team members the specific task information and requirements relevant to undertaking pavement condition measurement
  • 1.3. Ensure that the pavement condition measurement equipment is prepared for the task
  • 1.4. Prepare a job plan, in conjunction with relevant team members, which makes best use of the available resources
2. Initiate and undertake the measurement of pavement condition
  • 2.1. Acquire and make available the necessary resources for the safe, effective and efficient conduct of the task
  • 2.2. Issue clear and timely instructions to team members and others involved in the task
  • 2.3. Complete the measurement of pavement condition
3. Complete pavement condition measurement post-operational requirements
  • 3.1. Validate reading recorded by the pavement condition measurement equipment
  • 3.2. Ensure plant equipment and tools maintenance requirements are carried out and recorded
  • 3.3. Complete and submit reports as required
  • 3.4. Recommend changes to improve the safety, efficiency and effectiveness of pavement condition measurement.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Specific task information and requirements
may include:
site meteorological data
known and potential site hazards, constraints and conditions
site cultural and heritage information
task specifications
task drawings
other company and contractors involved in the task or related tasks
coordination, timing and budgeting requirements
Pavement condition measurement
may include:
roads
busways
Job plan
may include:
human resource requirements
plant and machinery requirements
construction materials requirements
sub-contractor support requirements
waste disposal requirements
coordination requirements
activity scheduling
materials delivery scheduling
risk assessment and management requirements
occupational health and safety requirements
quality management requirements, including testing scheduling requirements
traffic management requirements
environmental requirements
task monitoring requirements
task performance monitoring requirements
communication requirements
reporting requirements
Team members
may include:
other members of the organisation's management team
experienced members of the team directly involved in the task sub-contractors representatives
supervisors or managers of other organisations who are involved in related tasks
experienced members of the team directly involved in the task
Resources
may include:
labour
plant, equipment and tools
highway vehicles
sub-contractor services
Instructions
may include:
briefings
handovers
work orders
toolbox meetings
site meetings

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the carrying out of pavement condition measurement
implementation of appropriate procedures and techniques for the safe, effective and efficient carrying out of pavement condition measurement
working with others to plan, prepare and conduct the carrying out of pavement condition measurement
provision of clear and timely instruction and supervision by the individual of those involved in the carrying out of pavement condition measurement
evidence of the consistent successful carrying out of pavement condition measurement
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Evidence for assessment is best gathered using the outcomes of products and processes in the workplace.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to plan, prepare and conduct pavement condition measurement
provision of clear and timely instruction and supervision by the individual of those involved in the conduct of pavement condition measurement
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaces
State Code National Code Title Type
W5813 RIICC419A Carry out pavement condition measurement Unit of competency
Replaced By
State Code National Code Title Type
WH144 RIICRC405D Carry out pavement condition measurement Unit of competency
State Code National Code Title Type
W692 RII40709 Certificate IV in Civil Construction Supervision Qualification