Unit of competency Outline
Date retreived
22/07/2026 8:10 PM AWST
22/07/2026 8:10 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install laminate timber and bamboo flooring
Install laminate timber and bamboo flooring
Unit of competency
National Code
MSFFL2023
MSFFL2023
State Code
WI353
WI353
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
20
Description
This unit of competency covers floating a laminate, pre-finished timber or bamboo floor within a space over a soft underlay, including preparation, cutting, laying and fixing. It applies to a variety of flooring technology installation operations in an on-site environment and involves application of skills and knowledge at the sub-trade worker level.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare materials for installation
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing laminate timber and bamboo flooring are verified and complied with
- 1.2 WHS requirements, including personal protection needs, are observed throughout the work
- 1.3 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.4 Sub-floor condition is assessed for suitability for installation of laminate timber or bamboo flooring
- 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.6 Sequence of work is planned, including the selection of a starting point, to ensure efficiency and quality of installation
2 Set out materials for installation
- 2.1 Laminate timber or bamboo flooring is acclimatised according to manufacturer recommendations
- 2.2 Laminate timber flooring or bamboo for fixing is organised and used in accordance with relevant safety management requirements
- 2.3 Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining
- 2.4 Adhesives and edge strips are prepared for use as required
- 2.5 Working lines and starting point are established
3 Lay out flooring
- 3.1 Instructions and sequence for laying and fixing are followed
- 3.2 Appropriate underlay is laid according to manufacturer recommendations
- 3.3 Laminate timber or bamboo flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins
- 3.4 The aesthetics of the materials are maximised, including matching grains and colours
- 3.5 Laminate timber or bamboo flooring materials are accurately and clearly marked for cutting
- 3.6 Materials are cut to length and size for final laying ensuring minimum waste
4 Lay flooring
- 4.1 Materials for fixing are organised and used in accordance with relevant safety management requirements
- 4.2 Adhesives and edge strips/accessories are prepared for use as required
- 4.3 Fixing methods and equipment are used following manufacturer recommendations
- 4.4 Appropriate field and perimeter expansion joints are allowed
- 4.5 Skirting boards or cover trims are fitted/re-fitted and finished
- 4.6 Finished job is inspected and any imperfections are rectified following workplace procedures
- 4.7 Any required preparations for sanding of flooring are made
5 Complete housekeeping
- 5.1 Unused materials are stored or recycled as required
- 5.2 Tools and equipment are cleaned and stored appropriately
- 5.3 Work area is cleaned and rubbish is disposed of appropriately
- 5.4 Workplace documentation is completed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8546 | LMFFL2501A | Install laminate and engineered timber flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ28 | MSFFL3101 | Install bamboo flooring | Unit of competency |
| OAJ84 | MSFFL2039 | Install laminate flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |
| J725 | MSF20113 | Certificate II in Furnishing | Qualification |