Unit of competency Outline
Date retreived
22/07/2026 6:59 AM AWST
22/07/2026 6:59 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install laminate and engineered timber flooring
Install laminate and engineered timber flooring
Unit of competency
National Code
LMFFL2501A
LMFFL2501A
State Code
W8546
W8546
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
07/12/2010
Field of Education
040321 - Floor Coverings
Original Release Date
07/12/2010
Nominal Hours
36
Description
This unit specifies the outcomes required to float a laminate, pre-finished or engineered timber floor within a space over a soft underlay including preparation, cutting, laying and fixing.
Notes
Elements and Performance Criteria
1. Prepare materials for installation
- 1.1. Applicable legislative, OHS and organisational requirements relevant to the installing laminate and engineered timber flooring are verified and complied with
- 1.2. Workplace health and safety requirements, including personal protection needs, are observed throughout the work
- 1.3. Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.4. Sub-floor condition is assessed for suitability for installation of laminate and engineered timber flooring
- 1.5. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.6. Sequence of work is planned, including the selection of a starting point, to ensure efficiency and quality of installation
2. Set out materials for installation
- 2.1. Laminate and engineered timber flooring is acclimatised according to manufacturer recommendations
- 2.2. Laminate and engineered timber flooring for fixing is organised and used in accordance with relevant safety management requirements
- 2.3. Skirting boards or cover trims are removed or undercut if required and stored for refitting or sent for machining
- 2.4. Adhesives and edge strips are prepared for use as required
- 2.5. Working lines and starting point are established
3. Lay out flooring
- 3.1. Instructions and sequence for laying and fixing are followed
- 3.2. Appropriate underlay is laid according to manufacturers' recommendations
- 3.3. Laminate and engineered timber flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins
- 3.4. The aesthetics of the materials are maximised including matching grains and colours
- 3.5. Laminate and engineered timber flooring materials are accurately and clearly marked for cutting
- 3.6. Materials are cut to length and size for final laying ensuring minimum waste
4. Lay flooring
- 4.1. Materials for fixing are organised and used in accordance with relevant safety management requirements
- 4.2. Adhesives and edge strips/accessories are prepared for use as required
- 4.3. Fixing methods and equipment are used following manufacturer recommendations
- 4.4. Appropriate field and perimeter expansion joints are allowed
- 4.5. Skirting boards or cover trims are fitted/refitted and finished
- 4.6. Finished job is inspected and any imperfections are rectified following workplace procedures
- 4.7. Any required preparations for sanding of flooring are made
5. Complete housekeeping
- 5.1. Unused materials are stored or recycled as required
- 5.2. Tools and equipment are cleaned and stored appropriately
- 5.3. Work area is cleaned and rubbish is disposed of appropriately
- 5.4. Workplace documentation is completed
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative requirements
are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage
OHS requirements
are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling including lifting and carrying
Organisational requirements
may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Laminate and engineered timber flooring
includes timber and laminated flooring planks
Instructions
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to reporting and communications
Manufacturer instructions for the use of equipment and materials
Sub-floor assessment
is to include testing for moisture content, expansion, rot, structural strength, smoothness and plane
Tools and equipment
are to include drop saw, jig saw, hand saw, undercut saw, plunge saw, hammer, bar scriber and utility knife
may include circular saw, bench saw, straight edge, glue gun, staple gun, nailers, flooring cramps, strap clamps and wall clamps
Materials
may include but not be limited to flooring materials, underlay, edge strips, tapes and adhesives
Adhesives
may include PVAs, epoxies and polyurethane elastomeric
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative requirements
are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage
OHS requirements
are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling including lifting and carrying
Organisational requirements
may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Laminate and engineered timber flooring
includes timber and laminated flooring planks
Instructions
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to reporting and communications
Manufacturer instructions for the use of equipment and materials
Sub-floor assessment
is to include testing for moisture content, expansion, rot, structural strength, smoothness and plane
Tools and equipment
are to include drop saw, jig saw, hand saw, undercut saw, plunge saw, hammer, bar scriber and utility knife
may include circular saw, bench saw, straight edge, glue gun, staple gun, nailers, flooring cramps, strap clamps and wall clamps
Materials
may include but not be limited to flooring materials, underlay, edge strips, tapes and adhesives
Adhesives
may include PVAs, epoxies and polyurethane elastomeric
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing laminate and engineered timber flooring
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including the use of personal protective equipment
Apply ventilation standards
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
Complete a minimum of three of the following different types of installation:
glue-together system
direct stick system
self-locking system
inserted plastic tongue system
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
a realistic installation requirement
workplace location or simulated workplace
materials and equipment relevant for the installation of laminate and engineered timber flooring
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing laminate and engineered timber flooring
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including the use of personal protective equipment
Apply ventilation standards
Follow work instructions, operating procedures and inspection practices to:
minimise the risk of injury to self and others
prevent damage to goods, equipment and products
maintain required production output and product quality
Complete a minimum of three of the following different types of installation:
glue-together system
direct stick system
self-locking system
inserted plastic tongue system
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment
Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
a realistic installation requirement
workplace location or simulated workplace
materials and equipment relevant for the installation of laminate and engineered timber flooring
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W0192 | LMFFC2009A | Install pre-finished and manufactured/engineered timber flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WI353 | MSFFL2023 | Install laminate timber and bamboo flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W506 | LMF31208 | Certificate III in Flooring Technology | Qualification |
| W501 | LMF20908 | Certificate II in Flooring Technology | Qualification |