Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out rail installation
Carry out rail installation
Unit of competency
National Code
TLIS2044
TLIS2044
State Code
AVH74
AVH74
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
20
Description
This unit involves the skills and knowledge required to install rail in accordance with safeworking and regulatory requirements, and organisational policies and procedures.It includes identifying job requirements, preparing rail for installation, installing rail, joining rail ends, restoring track and completing documentation.People achieving competence in this unit will need to fulfil applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under supervision, generally in a team environment. It involves the application of routine operational principles and procedures when installing rail, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Identify job requirements
- 1.1 Scope of work is determined and resources are arranged
- 1.2 Hazards are identified, risks are assessed and control measures are implemented
- 1.3 Replacement rail is checked for compliance with acceptance rail network standards, in accordance with organisational procedures
2 Prepare rail for installation
- 2.1 Rails are loaded and unloaded using approved methods to minimise risk to health and safety, and damage to rail components
- 2.2 Rails are cut to required length using an appropriate method to minimise delays and wastage
- 2.3 Rails are bent, as required, to the correct curvature to ensure correct track geometry is maintained to rail industry standard
3 Position rail
- 3.1 Existing rail is unfastened and removed, as required, using appropriate equipment or manual method
- 3.2 New rail is lifted into place using appropriate equipment or manual method, maximising efficiency and minimising risk of injuries
4 Join rail ends
- 4.1 Rail joints are prepared for welding or are assembled and installed to specifications in accordance with organisational procedures
- 4.2 Rail bonds or other track circuit connections are installed or restored, as required, in accordance with organisational procedures
5 Restore track
- 5.1 Track fastenings are restored in accordance with organisational procedures
- 5.2 Track measurements are recorded in accordance with workplace procedures
- 5.3 Equipment used to restore track is stored after use
6 Complete documentation
- 6.1 Documentation is completed in accordance with organisational procedures
- 6.2 Documentation is processed in accordance with organisational procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8341 | TLIS2044A | Carry out rail installation | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGM7 | TLI27120 | Certificate II in Rail Infrastructure | Qualification |
| AWT3 | TLI21315 | Certificate II in Rail Infrastructure | Qualification |
| BHH8 | TLI27121 | Certificate II in Rail Infrastructure | Qualification |
| AWV9 | TLI22215 | Certificate II in Tram or Light Rail Infrastructure | Qualification |