Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Finish concrete

Finish concrete

Unit of competency
National Code
CPCCCO3042
State Code
OAP36
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
17/01/2019
State Implementation and Classification
Approved Date
12/04/2019
Field of Education
040399 - Building, N.e.c.
Original Release Date
12/04/2019
Nominal Hours
100
Description
This unit of competency specifies the skills and knowledge required to finish placed and screeded concrete surfaces to specified finish requirements, including edge finishing.It includes manual and mechanical finishing techniques applied to concrete on commercial, residential and civil construction sites.It applies to concreters working as members of a team with at least a moderate degree of autonomy. They would be expected to complete routine activities without close supervision.Licensing, legislative, regulatory or certification requirements apply to this unit of competency in all states and territories except Tasmania. Relevant state and territory regulatory authorities should be consulted to confirm these requirements.
Notes
Elements and Performance Criteria
1. Plan and prepare to finish concrete.
  • 1.1 Review and clarify task to finish concrete.
  • 1.2 Review task specifications and check to make sure they are in accordance with legislation, regulations and codes of practice.
  • 1.3 Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
  • 1.4 Identify safety signage and barricade requirements.
  • 1.5 Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
  • 1.6 Select plant, tools and equipment, check for serviceability and rectify or report any faults.
2. Apply concrete finishing techniques.
  • 2.1 Erect identified safety signage and barricades, and fit personal protective equipment (PPE).
  • 2.2 Leave concrete untouched until bleed water has come to the surface and evaporated.
  • 2.3 Assess surface of concrete during curing process and maintain level surface to allow manual and mechanical trowelling to be applied.
  • 2.4 Assess strength of setting concrete using a basic thumb test to ensure weight of mechanical trowel and operator can be accommodated.
  • 2.5 Apply mechanical trowelling in multiple overlapping lines to consolidate and densify the setting concrete surface.
  • 2.6 Install control joints, finish edges, and trowel concrete to specifications.
  • 2.7 Finish concrete in accordance with job specifications.
3. Clean up after finishing concrete.
  • 3.1 Clear work area and dispose of, reuse or recycle materials in accordance with legislation, regulations, codes of practice and task requirements.
  • 3.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications and workplace requirements.
No information
No information
Replaces
State Code National Code Title Type
WI728 CPCCCO3042A Finish concrete Unit of competency
Replaced By
State Code National Code Title Type
OCQ54 CPCCON3042 Finish concrete Unit of competency
State Code National Code Title Type
BEG4 CPC30318 Certificate III in Concreting Qualification