Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Finish concrete
Finish concrete
Unit of competency
National Code
CPCCCO3042A
CPCCCO3042A
State Code
WI728
WI728
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
100
Description
This unit of competency specifies the outcomes required to finish concrete surfaces that have been placed and screeded in line with specified finish requirements.The unit includes both manual and mechanical finishing techniques. It may also include working with others and as a member of a team.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.
- 1.2 Plant, tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins.
- 1.3 Material quantity requirements are identified and calculated according to plans, specifications and quality requirements.
- 1.4 Materials appropriate to the work application are obtained, prepared, safely handled and located ready for use.
- 1.5 Environmental requirements are identified for the project according to environmental plans and regulatory requirements.
2 Apply concrete finishing techniques.
- 2.1 Bull float is applied immediately after initial screeding while concrete is still plastic, to assist in maintaining a level surface consistent with drawings and specifications and to remove screeding lines and inaccuracies.
- 2.2 Surface of concrete is assessed during the curing process and level surface is maintained to allow manual and mechanical trowelling to be applied.
- 2.3 Concrete is observed and left untouched until bleed water has come to the surface and evaporated.
- 2.4 Strength of setting concrete is assessed using a basic thumb test to ensure weight of mechanical trowel and operator can be accommodated.
- 2.5 Mechanical trowelling is applied and reapplied in multiple overlapping lines, to consolidate and densify the setting concrete surface.
- 2.6 Control joints are installed, edges finished and concrete trowelled to specifications.
- 2.7 Concrete is finished according to job specifications.
3 Clean up.
- 3.1 Work area is cleared and materials disposed of, reused or recycled according to regulations, codes of practice and job specification.
- 3.2 Plant, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
availability of SDS for substances to be used
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
signage and restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to finishing concrete, including Australian standards
safe work procedures relating to finishing concrete
safety data sheets for substances to be used
signage
verbal, written and diagrammatic instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
calculating time required to complete task
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting the work site.
Tools and equipment:
must include:
bull floats
power, hand or wooden floats
magnesium trowels
power trowels
steel trowels
may include:
brooms
channel trowels
edging tools
hoses
step readers
stipple plates.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications where specified
regulations and Australian standards relating to finishing concrete
workplace operations and procedures.
Environmental requirements may include:
clean-up management
dust and noise control
stormwater management
vibration management
waste management.
Edge finishing types must include:
fine
rounded
straight edge.
Finished may include:
broom finished
brushed
bull floated
hand floated (wooden, magnesium or composition)
slip resistant
sprayed and brushed to expose aggregate
steel trowelled
use of a mechanical trowelling machine
wood floated.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
availability of SDS for substances to be used
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
signage and restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to finishing concrete, including Australian standards
safe work procedures relating to finishing concrete
safety data sheets for substances to be used
signage
verbal, written and diagrammatic instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
calculating time required to complete task
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting the work site.
Tools and equipment:
must include:
bull floats
power, hand or wooden floats
magnesium trowels
power trowels
steel trowels
may include:
brooms
channel trowels
edging tools
hoses
step readers
stipple plates.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications where specified
regulations and Australian standards relating to finishing concrete
workplace operations and procedures.
Environmental requirements may include:
clean-up management
dust and noise control
stormwater management
vibration management
waste management.
Edge finishing types must include:
fine
rounded
straight edge.
Finished may include:
broom finished
brushed
bull floated
hand floated (wooden, magnesium or composition)
slip resistant
sprayed and brushed to expose aggregate
steel trowelled
use of a mechanical trowelling machine
wood floated.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to finish five different concrete surfaces, each measuring at least 100 square metres, according to job specifications.
The evidence provided should demonstrate the ability to:
identify the appropriate time to apply finishing concrete techniques to ensure minimal delay and waste and that finished concrete meets job specifications
correctly use relevant hand and power tools
locate, interpret and apply relevant information, standards and specifications relating to finishing concrete
comply with site safety plans and procedures
comply with organisational policies and procedures relating to finishing concrete while maintaining quality requirements outlined in job specifications
safely and effectively operate and use plant, tools and equipment required to finish concrete
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to finishing concrete
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function for example:
CPCCCO2022A Use and maintain concreting plant, tools and equipment.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to finish five different concrete surfaces, each measuring at least 100 square metres, according to job specifications.
The evidence provided should demonstrate the ability to:
identify the appropriate time to apply finishing concrete techniques to ensure minimal delay and waste and that finished concrete meets job specifications
correctly use relevant hand and power tools
locate, interpret and apply relevant information, standards and specifications relating to finishing concrete
comply with site safety plans and procedures
comply with organisational policies and procedures relating to finishing concrete while maintaining quality requirements outlined in job specifications
safely and effectively operate and use plant, tools and equipment required to finish concrete
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to finishing concrete
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function for example:
CPCCCO2022A Use and maintain concreting plant, tools and equipment.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7360 | CPCCCO3022A | Finish concrete | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAP36 | CPCCCO3042 | Finish concrete | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J784 | CPC30313 | Certificate III in Concreting | Qualification |