Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct portals
Construct portals
Unit of competency
National Code
RIICTC305E
RIICTC305E
State Code
OCY12
OCY12
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030901 - Construction Engineering
Original Release Date
18/06/2021
Nominal Hours
20
Description
This unit describes the skills and knowledge required to construct portals in civil construction. This includes excavating portal shape, supporting excavation, forming portal surrounds and installing ground supportIt applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures. Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to construct portals
- 1.1 Obtain, interpret, clarify and confirm work instructions
- 1.2 Access, interpret and apply documentation required to construct portals and confirm work activity is compliant
- 1.3 Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
- 1.4 Select plant, tools and equipment required to carry out tasks and check for faults
- 1.5 Select and wear personal protective equipment according to site requirements
- 1.6 Obtain and interpret emergency procedures and identify steps required to respond to emergencies
- 1.7 Identify preliminary ground work requirements to support portal surrounds prior to excavation
- 1.8 Identify and address potential risks, hazards and environmental issues, and implement control measures within scope of own role
2. Excavate portal shape
- 2.1 Determine location, alignment and direction portals from details contained in job drawings and specifications
- 2.2 Identify and apply method of construction for portal
- 2.3 Prepare material for the construction process of the selected portals according to design plans and specifications
- 2.4 Complete excavation to plan
- 2.5 Control dust and noise suppression according to safety and legislative requirements
3. Support excavation and form portal surrounds
- 3.1 Install sheeting or first set to specifications
- 3.2 Excavate and trim battering to design and drainage specifications
4. Install ground support
- 4.1 Identify ground support from project drawings and specifications
- 4.2 Construct base to detail drawings and specifications
- 4.3 Install ground support and shotcrete or concrete according to job requirements
- 4.4 Place drainage and seepage provisions according to job requirements
5. Conduct housekeeping activities
- 5.1 Clear work area and dispose of or recycle materials according to site requirements
- 5.2 Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements
- 5.3 Carry out housekeeping activities according to site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH179 | RIICTC305D | Construct portals | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |