Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Fabricate and install non-ferrous pressure piping

Fabricate and install non-ferrous pressure piping

Unit of competency
National Code
CPCPCM3023
State Code
OCO72
TGA Status
Current
DTWD Status
Approved
Current Release Number
3.00
Current Release Date
09/12/2021
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
16
Description
This unit specifies the skills and knowledge required to fabricate and install non-ferrous pressure piping.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, and regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Identify installation requirements.
  • 1.1 Access, read and determine requirements to fabricate and install non-ferrous pressure piping from relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
  • 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
2 Prepare for work.
  • 2.1 Create a materials list and collect materials.
  • 2.2 Set up silver brazing equipment according to workplace and WHS procedures.
  • 2.3 Select and check serviceability of appropriate tools and equipment including personal protective equipment (PPE).
3 Fabricate, install and test pipe system.
  • 3.1 Set out pipelines and connection points according to drawings and specifications or job instructions.
  • 3.2 Use silver brazing equipment according to workplace and WHS procedures.
  • 3.3 Install pipework in accordance with relevant job plans and specifications, codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
  • 3.4 Test installed pipework according to s relevant codes, Australian standards, manufacturer’s specifications and jurisdictional requirements.
  • 3.5 Shut down and dismantle silver brazing equipment according to workplace and WHS procedures.
4 Clean up.
  • 4.1 Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
  • 4.2 Clean tools and equipment, check for serviceability reporting any damage, store and secure.
No information
No information
Replaces
State Code National Code Title Type
WF846 CPCPCM3023A Fabricate and install non-ferrous pressure piping Unit of competency