Unit of competency Outline

Date retreived
23/07/2026 5:35 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install wall tiles

Install wall tiles

Unit of competency
National Code
CPCCWF3003
State Code
OCP12
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
01/06/2021
Nominal Hours
110
Description
This unit of competency specifies the skills and knowledge required to use adhesive to install wall tiles to differing substrates.It includes the preparation, cutting, installation and grouting of tiles for walls, including internal and external wall junctions and junctions between walls and floors.A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.Licensing, legislative or certification requirements apply to this unit in some states and territories and users are advised to check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1 Plan and prepare to install wall tiles.
  • 1.1 Read and interpret task work instructions and plan sequence of work.
  • 1.2 Select and use personal protective equipment (PPE) as required for each stage of the task.
  • 1.3 Plan all work to comply with laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
  • 1.4 Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
  • 1.5 Select tools and equipment, check for serviceability and report any faults.
  • 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Set out wall tiling.
  • 2.1 Prepare substrate and area to be tiled, including checking waterproof membrane for integrity and conformance to regulatory requirements.
  • 2.2 Check tiles conform to size, pattern, colour and characteristic requirements of the task and are fit for purpose.
  • 2.3 Check internal and external corner substrates for square and plumb.
  • 2.4 Determine and set out tile work grid patterns to be symmetrical and balanced with movement joints, and to produce minimal waste.
3 Cut wall tiles.
  • 3.1 Cut tiles without damage to tile edges, surfaces or finish.
  • 3.2 Cut holes for penetrations to shape, size and specified tolerance.
4 Prepare substrate and install wall tiles
  • 4.1 Prepare and apply adhesive to substrate and/or tile surface.
  • 4.2 Prepare and install tiles set to level and plumb.
  • 4.3 Check horizontal joint for straightness, and check tile edges and surface alignment.
  • 4.4 Install tiles to alignment, maintaining designed pattern.
  • 4.5 Install tiles with required coverage, maintaining joint and face alignment.
  • 4.6 Show even margins around openings, frames and fittings.
  • 4.7 Maintain joints straight and uniform in width with due allowance for tolerance of tile sizes.
  • 4.8 Insert specified movement joints.
5 Tile internal and external corners.
  • 5.1 Check setting out for plumb, level and square and to be within specified tolerance.
  • 5.2 Cut and install bottom course to create raked corner.
  • 5.3 Make joints for abutting tiles in accordance with designed margin for grouting and movement joints.
  • 5.4 Install cove and/or coved tiles to internal corners.
  • 5.5 Install trim or mitre to external corners.
6 Grout tiles.
  • 6.1 Clean and prepare joints to receive grout.
  • 6.2 Mix and apply grout.
  • 6.3 Clean and polish tiles.
  • 6.4 Protect tiles from damage during remaining construction.
7 Clean up.
  • 7.1 Clear work area and dispose of, reuse or recycle materials.
  • 7.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ recommendations.
No information
No information
Replaces
State Code National Code Title Type
W9612 CPCCWF3003A Fix wall tiles Unit of competency
State Code National Code Title Type
BGE1 CPC31320 Certificate III in Wall and Floor Tiling Qualification