Unit of competency Outline
Date retreived
22/07/2026 3:08 PM AWST
22/07/2026 3:08 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install property service
Install property service
Unit of competency
National Code
CPCPWT3028
CPCPWT3028
State Code
OCM59
OCM59
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
8
Description
This unit of competency specifies the skills and knowledge required to install a property service from the authority water main up to and including the water meter assembly.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Identify installation requirements.
- 1.1 Access, read and determine property service installation requirements from job specifications, relevant Australian Standards, codes, manufacturers’ instructions and jurisdictional requirements.
- 1.2 Identify and apply workplace, work health and safety (WHS) and environmental requirements.
- 1.3 Determine location of property service and the main.
- 1.4 Identify cables, conduits, pipes or other services.
2 Prepare for work.
- 2.1 Create a materials list and collect materials.
- 2.2 Select appropriate tools and equipment including personal protective equipment (PPE).
3 Install, test and commission property service.
- 3.1 Mark out and excavate for installation of property service.
- 3.2 Excavate point of connection to main.
- 3.3 Drill and tap main in accordance with relevant Australian Standards, codes and jurisdictional requirements.
- 3.4 Install property service.
- 3.5 Test and commission installation.
4 Clean up.
- 4.1 Clear the work area and dispose of, reuse or recycle materials in accordance with state or territory legislation and workplace requirements.
- 4.2 Clean tools and equipment, check for serviceability and report any damage, and store and secure.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF972 | CPCPWT3028A | Install water service | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGC1 | CPC32820 | Certificate III in Fire Protection | Qualification |
| BGC2 | CPC32420 | Certificate III in Plumbing | Qualification |