Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain de-energised high voltage underground paper insulated cables
Install and maintain de-energised high voltage underground paper insulated cables
Unit of competency
National Code
UETTDRCJ23
UETTDRCJ23
State Code
OBI38
OBI38
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
54
Description
This unit involves the skills and knowledge required to install and maintain de-energised high voltage (HV) underground paper insulated cables in the electricity supply industry (ESI).It includes completing and updating system data/maintenance records of de-energised HV underground paper insulated cables, jointing, terminating, repairing and replacing cables. It also includes isolating cables, issuing permits and undertaking pre-commissioning tests.De-energised means separated from all sources of supply but not necessarily isolated, earthed, discharged or out of commission.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to joint and maintain de-energised HV underground paper insulated cables
- 1.1 Work schedules, plans, drawings, workplace procedures and material lists are received and confirmed
- 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
- 1.3 Work health and safety (WHS)/occupational health and safety (OHS), environmental and workplace procedures for the installation and maintenance of de-energised HV underground paper insulated cables are obtained and confirmed for the purposes of the work to be performed
- 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- 1.5 WHS/OHS and environmental hazards are identified, risks are assessed and control measures identified in accordance with workplace procedures
- 1.6 Relevant work permits are obtained, understood and signed in accordance with workplace procedures
- 1.7 Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- 1.8 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
- 1.9 Traffic management plan is confirmed as being applied in accordance with workplace procedures
2 Carry out installation and maintenance of de-energised HV underground paper insulated cables
- 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents of accidents in accordance with workplace procedures
- 2.2 Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- 2.3 Cables are tested in accordance with workplace procedures
- 2.4 Cables are prepared for jointing, terminating or maintaining in accordance with construction drawings, manufacturer instructions and workplace procedures
- 2.5 Cables are jointed, terminated or maintained in accordance with construction drawings, manufacturer instructions and workplace procedures
- 2.6 Unplanned events in the installation and maintenance of de-energised HV underground paper insulated cables are responded to in accordance with workplace procedures
- 2.7 Quality checks of work are undertaken in accordance with workplace procedures
3 Complete installation and maintenance of de-energised HV underground paper insulated cables
- 3.1 Completed work is checked against work plan, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
- 3.2 WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
- 3.3 Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- 3.4 Tools, equipment and surplus resources are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- 3.5 Relevant work permits are signed off in accordance with workplace procedures
- 3.6 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD602 | UETTDRCJ23A | Install and maintain de-energised high voltage underground paper insulated cables | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODM99 | UETDRDU012 | Joint, terminate and maintain high voltage underground paper insulated cable | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEV6 | UET40419 | Certificate IV in ESI - Network Systems | Qualification |
| BEV2 | UET30819 | Certificate III in ESI - Power Systems - Distribution Cable Jointing | Qualification |