Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Assist in the construction and maintenance of a non-permanent bulk fuel installation

Assist in the construction and maintenance of a non-permanent bulk fuel installation

Unit of competency
National Code
DEFPE004A
State Code
AVV59
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
24/01/2013
State Implementation and Classification
Approved Date
Field of Education
030717 - Plant And Machine Operations
Original Release Date
Nominal Hours
0
Description
This unit covers the competency required to assist in the construction and maintenance of multi product non-permanent bulk fuel installations, often situated in a remote locality.
Notes
Elements and Performance Criteria
1. Prepare for construction
  • 1.1 Installation instructions, including schematic diagrams, are received and confirmed with supervisor
  • 1.2 Equipment is selected and inspected for serviceability prior to construction
  • 1.3 Safety equipment is set-up prior to commencement of construction
  • 1.4 Work health and safety (WHS) requirements and recognised safety precautions are applied throughout the operation in accordance with standard procedures
  • 1.5 Environmentally sustainable work practices are identified, assessed and implemented where feasible
2. Construct field bulk fuel installations
  • 2.1 Storage tanks are positioned in accordance with schematic diagrams and orders
  • 2.2 Manifold system is constructed in accordance with workplace procedures and schematic diagram
  • 2.3 Problems encountered during construction process are rectified within scope of own authority or reported to supervisor
  • 2.4 Installation is pressure tested and commissioned in accordance with supervisor's instructions and workplace procedures
  • 2.5 Site is refurbished in accordance with workplace procedures
3. Maintain field bulk fuel installations
  • 3.1 Equipment is maintained in accordance with manufacturers' instructions and workplace procedures
  • 3.2 Housekeeping duties are performed in accordance with workplace procedures
  • 3.3 Bulk fuel storage tanks are measured and levels are recorded in accordance with workplace procedures
  • 3.4 Emergencies are responded to in accordance with workplace procedures
  • 3.5 Fuel istested for product contamination and results are recorded
  • 3.6 Contaminated product is quarantined and reported to supervisor
The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.
Schematic diagrams may include:
Bunding
Pipelines
Pumps
Safety equipment
Storage tanks
Equipment may include:
50 mm/100 mm fuel equipment including:
fittings
fuel metering equipment
pipelines and hoses
pumps
valves, vessels and tanks
Measurement instruments including:
hydrometers
thermometers
tapes
Safety equipment may include
Emergency shower/eye wash
Fire extinguishers
First aid kits
Spill kits
Manifold system may include:
Bonding
Earthing
Filters
Fittings
Pipes
Pumps
Valves
Workplace procedures may include:
Australian Standards
Briefs
Duty statements
Fire orders
Legislative requirements
Manufacturers' handbooks, industry specifications and technical instructions
WHS regulations
Organisational policies and procedures
Pollution control plan
Procedure manuals
Relevant state/territory or federal legislation
Standard Operating Procedures
Technical procedures
Written or verbal instructions
Problems encountered during construction process may include:
Damaged storage tanks and pipelines
Incorrect site selection/preparation
Insufficient equipment
Pressure testing of installation may include:
Correct earthing and bonding
Ensuring a closed system
Ensuring installation conforms to schematic diagram
Security of all components, fittings and fasteners
Testing installation for leaks
Commissioning of installation may include:
Receipting fuel
Testing fuel
Testing installation for serviceability
Housekeeping duties may include:
Inspecting bulk fuel installation for leaks
Inspecting integrity of earthing and bonding
Testing fuel for product contamination must include:
Appearance
Particulate
Water
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessment must confirm the ability to:
assist in constructing and maintaining different types of non-permanent bulk fuel installations of different sizes and with different fuel products to be stored
work as part of a team
work remotely
Consistency in performance
Competency should be demonstrated over time to ensure the candidate is assessed across a wide variety of situations within the workplace.
Context of and specific resources for assessment
Context of assessment
Competency should be assessed in a field environment.
Specific resources for assessment
Access is required to:
workplace equipment required for the construction of non-permanent bulk fuel installations
safety equipment and personal protective equipment
specific workplace operating procedures and publications
Replaced By
State Code National Code Title Type
BBC18 DEFPET004 Assist in the construction and maintenance of a non-permanent bulk fuel installation Unit of competency
No information