Unit of competency Outline
Date retreived
22/07/2026 1:41 PM AWST
22/07/2026 1:41 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare surfaces for tiling application
Prepare surfaces for tiling application
Unit of competency
National Code
CPCCWF3001A
CPCCWF3001A
State Code
W9610
W9610
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
18/11/2011
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
18/11/2011
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to repair and prepare different substrates for wall and floor tiling applications.It includes the preparation of materials and substrates for the tiling process.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Prepare materials for tiling application.
- 2.1. Floor and wall tiling materials are checked for product suitability, conformity to specification and compatibility with surface material, preparation and installation technique.
- 2.2. Activities for material preparation are identified from specifications, and manufacturers' or supervisor's instructions.
- 2.3. Material preparation is carried out to satisfy the requirements of the application process.
3. Prepare underlay and sheeting substrate.
- 3.1. Assistance with underlay preparation is provided under instructions and supervision.
- 3.2. Substrate surface is finished to approved surface standards with joints flush and sealed.
4. Prepare render substrate surface.
- 4.1. Surface-mounted construction units and attachments are safely detached, removed or arranged for removal from area and stored.
- 4.2. Substrate structure is identified and surfaces are cleaned to remove all contaminants and loose material in accordance with supervisor's instructions.
- 4.3. Materials for splash coat are proportioned and mixed to instructions ready for application to wet surface.
- 4.4. Horizontal and vertical surrounds are prepared for tiling process in accordance with type of tile and specified finish.
- 4.5. Materials for render coat are proportioned and mixed to instructions ready for application.
- 4.6. Surface is scratched, rendered, cured and dried to instructions in accordance with specifications for tile application.
5. Clean up.
- 5.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 5.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to preparing surfaces for tiling
relevant Australian standards
safe work procedures relating to preparing surfaces for tiling
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
traffic control
restricted access barriers
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
brooms
brushes
buckets
caulking guns
cement sheet cutters
concrete mixers
electrical leads
hammers
hose and water sprays
ladders
levelling equipment
lump hammers
measuring tapes and rules
mortar boards
nippers
pointed grouters
power drills and screwdrivers
power grinders and sanders
rags
rubber mallets
sanding blocks
saws
scrapers
shovels
spacers and wedges
spatulas
sponges
squares
squeegees
straight edges
stringlines
trowels
wet and dry diamond saws
wheelbarrows
wire brushes
wooden floats
work platforms.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials:
include:
adhesives
caulking compound
cement mortar (with and without additives)
clouts
cornice adhesive
fixings and fasteners
patching materials
plasterboard nails
pre-mixed and mixed fillers
sand and cement
self-tapping screws
soft sheet nails
wall board adhesive
may include:
acoustic underlay material
crack suppression membrane.
Environmental requirements include:
clean-up management
dust and noise
sedimentation control
vibration
waste management.
Underlay material may be:
acoustic
in sheet or liquid form
provide for crack suppression (in membrane form).
Substrate preparation includes:
chemical and mechanical preparation of surfaces
rendering to provide a flat surface
use of underlay material.
Substrate surface materials include:
fibre cement sheets or other lining material or cladding of a similar nature
painted surfaces
pre-cast cladding
solid plaster
stone, concrete, timber, waterproof plasterboard, masonry and brick/block
terrazzo
wall and floor tiles.
Surface-mounted construction includes:
aluminium framework fixing
attachment of steel brackets or fabricated units
brick or block walls or abutments
curtain walling fixing
fitment units
formwork and falsework construction
light steel partition walls
stair installations
timber partition walls.
Types of tiles include:
ceramic
glass
granite
marble
porcelain
stone
terracotta.
Surfaces include:
blockwork
brickwork
ceramic or fibro cement underlay
concrete walls
fibre cement sheet
rendered surfaces
timber
other approved waterproof surfaces.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to preparing surfaces for tiling
relevant Australian standards
safe work procedures relating to preparing surfaces for tiling
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
traffic control
restricted access barriers
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
brooms
brushes
buckets
caulking guns
cement sheet cutters
concrete mixers
electrical leads
hammers
hose and water sprays
ladders
levelling equipment
lump hammers
measuring tapes and rules
mortar boards
nippers
pointed grouters
power drills and screwdrivers
power grinders and sanders
rags
rubber mallets
sanding blocks
saws
scrapers
shovels
spacers and wedges
spatulas
sponges
squares
squeegees
straight edges
stringlines
trowels
wet and dry diamond saws
wheelbarrows
wire brushes
wooden floats
work platforms.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials:
include:
adhesives
caulking compound
cement mortar (with and without additives)
clouts
cornice adhesive
fixings and fasteners
patching materials
plasterboard nails
pre-mixed and mixed fillers
sand and cement
self-tapping screws
soft sheet nails
wall board adhesive
may include:
acoustic underlay material
crack suppression membrane.
Environmental requirements include:
clean-up management
dust and noise
sedimentation control
vibration
waste management.
Underlay material may be:
acoustic
in sheet or liquid form
provide for crack suppression (in membrane form).
Substrate preparation includes:
chemical and mechanical preparation of surfaces
rendering to provide a flat surface
use of underlay material.
Substrate surface materials include:
fibre cement sheets or other lining material or cladding of a similar nature
painted surfaces
pre-cast cladding
solid plaster
stone, concrete, timber, waterproof plasterboard, masonry and brick/block
terrazzo
wall and floor tiles.
Surface-mounted construction includes:
aluminium framework fixing
attachment of steel brackets or fabricated units
brick or block walls or abutments
curtain walling fixing
fitment units
formwork and falsework construction
light steel partition walls
stair installations
timber partition walls.
Types of tiles include:
ceramic
glass
granite
marble
porcelain
stone
terracotta.
Surfaces include:
blockwork
brickwork
ceramic or fibro cement underlay
concrete walls
fibre cement sheet
rendered surfaces
timber
other approved waterproof surfaces.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum (using a combination of underlay, render and mechanical and chemical techniques), prepare a bathroom work area for wall and floor tiling; prepare a timber bathroom floor and pointed fibre cement sheet wall for tiling; and prepare a concrete bathroom floor and pointed fibre cement sheet wall for tiling, ensuring:
correct identification of requirement and completion of the preparation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to preparing surfaces for tiling
hand and power tools, plant and equipment appropriate to preparing surfaces for tiling
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum (using a combination of underlay, render and mechanical and chemical techniques), prepare a bathroom work area for wall and floor tiling; prepare a timber bathroom floor and pointed fibre cement sheet wall for tiling; and prepare a concrete bathroom floor and pointed fibre cement sheet wall for tiling, ensuring:
correct identification of requirement and completion of the preparation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to preparing surfaces for tiling
hand and power tools, plant and equipment appropriate to preparing surfaces for tiling
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1921 | BCGWF3001B | Prepare surfaces for tiling application | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCP14 | CPCCWF3001 | Prepare surfaces for tiling application | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| 1599 | 52443WA | Certificate II in Building and Construction (Pathway - Trades) | Accredited course |
| D383 | CPC20211 | Certificate II in Construction Pathways | Qualification |
| D402 | CPC31311 | Certificate III in Wall and Floor Tiling | Qualification |
| W589 | CPC31308 | Certificate III in Wall and Floor Tiling | Qualification |