Qualification Outline
22/07/2026 4:46 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate III in Wall and Floor Tiling
Certificate III in Wall and Floor Tiling
CPC31308
W589
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 1.00 | 19/05/2011 | Current | Approved |
Description
Schedule
Packaging Rules
19 units of competency are required for award of the qualification:16 compulsory units plus
3 elective units
A maximum of one of the three required elective units may be substituted by selecting relevant units of competency from and Certificate III or IV construction qualification or qualification in another endorsed Training Package
1. Compulsory Units
All 7 units must be completed
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W9375 | CPCCCM2006A | Apply basic levelling procedures | 16 | Unit of competency |
| W9435 | CPCCOHS2001A | Apply OHS requirements, policies and procedures in the construction industry | 32 | Unit of competency |
| W9367 | CPCCCM1005A | Carry out measurements and calculations | 16 | Unit of competency |
| W9366 | CPCCCM1004A | Conduct workplace communication | 16 | Unit of competency |
| W9365 | CPCCCM1003A | Plan and organise work | 16 | Unit of competency |
| W9370 | CPCCCM2001A | Read and interpret plans and specifications | 32 | Unit of competency |
| W9364 | CPCCCM1002A | Work effectively and sustainably in the construction industry | 16 | Unit of competency |
2. Compulsory Units - Wall and Floor Tiling Field of Work
All 9 units must be completed
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W9623 | CPCCWP3002A | Apply waterproofing process to internal wet areas | 16 | Unit of competency |
| W9615 | CPCCWF3006A | Carry out mosaic tiling | 40 | Unit of competency |
| W9611 | CPCCWF3002A | Fix floor tiles | 120 | Unit of competency |
| W9612 | CPCCWF3003A | Fix wall tiles | 110 | Unit of competency |
| W9608 | CPCCWF2001A | Handle wall and floor tiling materials | 16 | Unit of competency |
| W9610 | CPCCWF3001A | Prepare surfaces for tiling application | 32 | Unit of competency |
| W9613 | CPCCWF3004A | Repair wall and floor tiles | 24 | Unit of competency |
| W9616 | CPCCWF3007A | Tile curved surfaces | 80 | Unit of competency |
| W9609 | CPCCWF2002A | Use wall and floor tiling tools and equipment | 60 | Unit of competency |
3. Elective Units
3 units to be completed
The elective units listed are ONE example of a training program for this qualification. Please refer to the Training Package for the full details of available options.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W9614 | CPCCWF3005A | Carry out decorative tiling | 40 | Unit of competency |
| W9377 | CPCCCM2008A | Erect and dismantle restricted height scaffolding | 16 | Unit of competency |
| W9617 | CPCCWF3008A | Tile domestic pools and spas | 80 | Unit of competency |
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W147 | BCG31303 | Certificate III in Wall and Floor Tiling | Qualification |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| D402 | CPC31311 | Certificate III in Wall and Floor Tiling | Qualification |
VET Info Notes
1. The program was created in STARS on 9/9/2009 by VET Teaching & Learning, Dept of Education & Training.
Entry Requirements
No information
Traineeships and Apprenticeships
For elite athletes the minimum hours of employment are 7.5 hours per week, which can be averaged over six month periods.