Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Handle wall and floor tiling materials

Handle wall and floor tiling materials

Unit of competency
National Code
CPCCWF2001A
State Code
W9608
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
18/11/2011
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
18/11/2011
Nominal Hours
16
Description
This unit of competency specifies the outcomes required to handle, store and apply environmental principles to wall and floor tiling products, materials and components.It includes the preparation, handling, sorting and stacking, distribution and disposal of wall and floor tiling products, materials and components in the application of the tiles to walls and floors.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Receive, sort and distribute wall and floor tiling materials.
  • 2.1. On delivery to site, wall and floor tiling products, material and components are identified and checked for conformity to material schedule, plans and specifications.
  • 2.2. Handling characteristics of wall and floor tiling material and components are identified and safe and effective handling techniques are applied in accordance with safe work method statements and OHS workplace operations.
  • 2.3. Wall and floor tiling adhesives are handled, proportioned, mixed and stored in preparation for application in accordance with supervisor's instructions and manufacturer recommendations.
  • 2.4. Wall and floor tiling bedding mortar material is handled, proportioned, mixed and stored in preparation for application in accordance with supervisor's instructions and manufacturer specifications.
  • 2.5. Wall and floor tiling material and components are sorted to suit material type and size, stacked for ease of identification and retrieval for task sequence.
  • 2.6. Wall and floor tiling material and components are distributed to job location.
3. Handle and remove surplus wall and floor tiling material.
  • 3.1. Materials are handled according to material safety data sheets (MSDS) and requirements of statutory and regulatory authorities.
  • 3.2. Hazardous material is identified for separate handling by authorised personnel.
  • 3.3. Wall and floor tiling material and components are handled, recovered and transferred from job location and stored in designated storage area according to MSDS and workplace requirements.
4. Clean up.
  • 4.1. Work area is cleared and waste materials are disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to handling wall and floor tiling materials
relevant Australian standards
safe work procedures relating to handling wall and floor tiling materials
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
traffic control
restricted access barriers
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
scissors
cutting blades
wheelbarrows
ladders
elevated work platforms
brooms
forklifts
pallet jacks
buckets
may include:
scaffolds
concrete mixers
adhesive mixers.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials include:
adhesives
caulking compound
cement mortar (with and without additives)
grout
tiles.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Tiling products include:
ceramic
glass
granite
marble
porcelain
stone
terracotta.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
Waste materials include:
banding straps
broken or damaged goods
cardboard
excess materials
packing pieces
paper
plastic.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum, given the plans and specifications for a bathroom wall and floor to be tiled, receive and confirm quantity and quality compliance; handle, sort, stack and distribute the tiles, materials and components to support the performance of the task; prepare and mix the required adhesives and mortar, grouting and finishes required for the job; and clean up and store or dispose of excess and waste materials on the completion of the job, ensuring:
correct identification of tiling requirement
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to handling wall and floor tiling materials
hand and power tools, plant and equipment appropriate to handling wall and floor tiling materials
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1919 BCGWF2001B Handle wall and floor tiling materials Unit of competency
Replaced By
State Code National Code Title Type
OCN90 CPCCWF2001 Handle wall and floor tiling materials Unit of competency