Unit of competency Outline

Date retreived
22/07/2026 4:34 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Carry out decorative tiling

Carry out decorative tiling

Unit of competency
National Code
CPCCWF3005A
State Code
W9614
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
10/10/2011
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
10/10/2011
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to locate and set out dimensions and plans for decorative tiling projects, to form a specific pattern and meet client requirements.It includes identifying, setting out, cutting and laying out tiles to walls and floors where advanced setting out is required to align wall and floor joints, including heritage tiles.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Prepare pattern and materials for tiling.
  • 2.1. Suitable architectural or historical period is identified and a range of appropriate patterns is produced.
  • 2.2. Style of tile is selected to conform with the elements of design.
  • 2.3. Colour and shape of tile are selected to conform with specifications and the geometry of the project.
  • 2.4. Details of pattern and selected tiles are confirmed with client.
3. Form decorative design.
  • 3.1. Tiles are set out to required shape and size to conform to pattern and decorative design.
  • 3.2. Examples of border, beading and strip returns are laid out.
  • 3.3. Tiles are cut, as necessary, to complete the pattern set out.
  • 3.4. Wall and floor tile joints are aligned plumb and square and cut tiles are positioned.
4. Prepare substrate.
  • 4.1. Substrate surfaces are prepared to specification and standard.
  • 4.2. Location of tiles is set out or marked directly onto the surface in accordance with job drawings and specification.
5. Fix tiles.
  • 5.1. Adhesive/mortar is applied to set out area.
  • 5.2. Wall tiles are laid from a selected position to ensure correct set out.
  • 5.3. Floor tiles are set out and laid from the centre, if necessary, to even set out.
  • 5.4. Border tiles are laid and adjusted to suit set out.
  • 5.5. Surface is finished in accordance with job specifications.
6. Grout tiles.
  • 6.1. Tiled surface is cleaned free of dust and adhesive.
  • 6.2. Grout is mixed and applied in accordance with manufacturer specifications and to meet job requirements.
  • 6.3. Finished surface is cleaned and polished with dry cloth to specifications.
7. Clean up.
  • 7.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 7.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to decorative tiling
relevant Australian standards
safe work procedures relating to decorative tiling
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
traffic control
restricted access barriers
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
buckets
caulking guns
levelling equipment
lump hammers
measuring tapes and rules
meter heating devices
nippers
pointed grouters
power drills
rags
rubber mallets
scrapers
shovels
spacers and wedges
sponges
squares
squeegees
straight edges
stringlines
tile cutters and scribes
trowels
wooden floats
may include:
concrete mixers
masonry drill bits.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials include:
adhesives
caulking compound
cement mortar (with and without additives)
grout
patterns
tiles.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Patterns are to be formed from:
principles of design relating to the architectural style required.
Types of tiles include:
ceramic
glass
porcelain
stone
terracotta
tessellated.
Client includes:
a builder
a customer
an architect
an interior designer.
Decorative design is to conform to:
advanced setting out techniques to achieve a whole room joint alignment or heritage effect.
Substrate surfaces include:
fibre cement sheet
brickwork
blockwork
concrete walls
timber
rendered surfaces
other waterproof surfaces.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum, select, set out and lay heritage style wall tiles and decorative strips to a 2 square metre wall finished to differing heights; and select, set out and lay tessellated floor tiles and a decorative border to an L-shaped area of approximately 1.5 square metres, ensuring:
correct identification of requirement and completion of the tiling
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to decorative tiling
hand and power tools, plant and equipment appropriate to decorative tiling
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1925 BCGWF3005B Carry out decorative tiling Unit of competency
Replaced By
State Code National Code Title Type
OCO82 CPCCWF3005 Install decorative tiling Unit of competency
State Code National Code Title Type
D402 CPC31311 Certificate III in Wall and Floor Tiling Qualification
W589 CPC31308 Certificate III in Wall and Floor Tiling Qualification